<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Alshoala Engineering Company</title>
	<atom:link href="https://www.alshoala.net/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.alshoala.net</link>
	<description></description>
	<lastBuildDate>Thu, 06 Feb 2025 08:24:37 +0000</lastBuildDate>
	<language>en-US</language>
		<sy:updatePeriod>hourly</sy:updatePeriod>
		<sy:updateFrequency>1</sy:updateFrequency>
	<generator>https://wordpress.org/?v=3.9.40</generator>
	<item>
		<title>Reference &#8211; template</title>
		<link>https://www.alshoala.net/reference-template/</link>
		<comments>https://www.alshoala.net/reference-template/#comments</comments>
		<pubDate>Tue, 06 May 2014 16:04:08 +0000</pubDate>
		<dc:creator><![CDATA[alshoala]]></dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.alshoala.net/?p=586</guid>
		<description><![CDATA[Project Title: Gas Plant Emergency Shutdown System Client: Sirte Oil Company Site: Sahl Field Description: Project includes the complete replacement of the old inoperative August Bonar System (now ABB) with Siemens PCS7, S7400HF system. Scope of works included the study, re-design, supply, installation and commissioning of new fail safe system, complete with training for client...]]></description>
				<content:encoded><![CDATA[<p><strong>Project Title:</strong> Gas Plant Emergency Shutdown System<br />
<strong>Client:</strong> Sirte Oil Company<br />
<strong>Site:</strong> Sahl Field</p>
<p><strong>Description:</strong> Project includes the complete replacement of the old inoperative August Bonar System (now ABB) with Siemens PCS7, S7400HF system. Scope of works included the study, re-design, supply, installation and commissioning of new fail safe system, complete with training for client engineers. Project also included the replacement of all Zener barriers, interfacing EX rated instrumentation to the control system, alarm archiving server and operator stations.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Replacement of Motor Drives and Control System for Water Treatment Plant (currently in progress)<br />
<strong>Client:</strong> Tripoli Medical Centre<br />
<strong>Site:</strong> Tripoli</p>
<p><strong>Description:</strong> Project includes the replacement of two Motor Drives (Siemens G150 Convertors) for 350Kw motors, including the engineering, supply and installation of a new control system and associated HMI.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Upgrade of Wire Drawing Machine<br />
<strong>Client:</strong> General Company for wires and electrical products<br />
<strong>Site:</strong> Benghazi</p>
<p><strong>Description:</strong> Project includes the overhaul of wire drawing machine control system, including the replacement of the main drive, capstan drive and spooler drive. System consisting of S7-300 CPU with ET200S remote I/O’s connected through Profibus network. HMI KTP 1000 basic color panel earmarked for operator interface.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Electrical Infrastructure Network SCADA System<br />
<strong>Client:</strong> Tripoli Medical Centre<br />
<strong>Site:</strong> Tripoli</p>
<p><strong>Description:</strong> Engineering design, Supply and installation of a SCADA system covering all HV &amp; LV substations within the hospital campus. All substations were connected in a ring configuration through a fiber backbone. Monitoring and control of stations is done through the main control room. Project also included the design and installation of an automatic changeover system, between mains power and backup generators.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Extension of water pipeline control system<br />
<strong>Client:</strong> Great Man Made River Authority (GMMRA)<br />
<strong>Site:</strong> Benghazi</p>
<p><strong>Description:</strong> Design of an extension to the existing control system for a water conveyance system, including the erection of a new Local Control Centre, complete with all telecommunication systems, computer room environment including ELV systems such as Access Control, Fire Alarm and suppression, structured cabling system and remote system monitoring.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Gas Compressor Control System<br />
<strong>Client:</strong> Mabrouk Oil Operations<br />
<strong>Site:</strong> Mabrouk Oil Field, Sirte</p>
<p><strong>Description:</strong> Program modification, testing, commissioning and startup of Gas Compressor control system. Main Controller Siemens Step 7 400H, interfaced to ABB DCS System through Modbus.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Wire Insulation Machine Control System<br />
<strong>Client:</strong> General Company for wires and electrical products<br />
<strong>Site:</strong> Benghazi Factory</p>
<p><strong>Description:</strong> Total overhaul of insulation machine control system. Works included the design, installation, programming, testing, commissioning and startup. Equipment installed included, Simatic Step 7 300 CPU, 7x DC Motors, 1X AC Motor, Temperature Controller, 1x ET200S, 2x ET200M and 2 PID Temperature Controllers. All motors and remote I/O’s were connected through a Profibus network. HMI through KTP1000 Basic Color Panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Silo Automation and Control Project<br />
<strong>Client:</strong> Tripoli Feed Mill Company<br />
<strong>Site:</strong> Flour Mill Silos, Tripoli</p>
<p><strong>Description:</strong> Complete design, installation, programming, testing, commissioning and startup of a loading and storage silo system, with approximately 3,000 Inputs and Outputs. Equipment installed included Simatic Step 7 319 CPU with 13x ET-200M Remote I/Os connected through a Profibus Network. HMI and visualization through MIMIC panel and WinCC SCADA software.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Forbay Water Storage Tank Automation and Control System<br />
<strong>Client:</strong> Great Man Made River Authority (GMMRA)<br />
<strong>Site:</strong> Benghazi</p>
<p><strong>Description:</strong> Complete design, installation, programming, testing, commissioning and startup of the Forbay Tank SCADA and Automation System. Hardware used included Simatic Step 7 300 CPU, 3x ET200S Remote I/Os, 2xET200M Station, 1x Pressure Transmitter, 2x Ultrasonic level transmitters, 2x Level Switches, 1x Electromagnetic Flowmeter, 2x Rotork Actuator Valves and 3x Huma valves. HMI through KTP1000 Basic Color Panel 10”.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Sewage Pumping Station Control System<br />
<strong>Client:</strong> DS Contruction<br />
<strong>Site:</strong> Girian</p>
<p><strong>Description:</strong> Complete design, installation, programming, testing, commissioning and startup of a Sewage pumping station control system. Hardware used included Simatic Step 7 1200 CPU, 8x Soft starters 6x 75KW &amp; 2x 11KW. HMI through KTP600 Basic Colour Panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Fuel Forwarding Terminal Control and SCADA System<br />
<strong>Client:</strong> Brega Petroleum and Marketing Company<br />
<strong>Site:</strong> Tripoli Airport Fuelling Station</p>
<p><strong>Description:</strong> Complete design, installation, programming, testing and commissioning of a control and SCADA system for the Tripoli Airport fuelling terminal. Hardware included S7-300 Main Controller, PDSIII Pressure Transmitter, Radar Level Transmitters, Rotork Actuator Valves, Oil System Filter, Soft Starters w/Profibus card for main pump and 3x Clamp-on Ultrasonic Flowmeters. WinCC SCADA system for control and monitoring. OP177P for local operation.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Sewage Treatment Plant Control System<br />
<strong>Client:</strong> Wabag<br />
<strong>Site:</strong> Tobruk STP</p>
<p><strong>Description:</strong> Programming, Modification, commissioning and startup of control system for 3 pumping stations and treatment plant. Each pumping station equipped with the following hardware: Step 7 300 main controller, pressure transmitters, level transmitters and soft starters. Main Treatment plant divided in 6 areas, connected through fiber optic cabling.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Tarhuna Agricultural Water Utilization Project<br />
<strong>Client:</strong> Great Man Made River Authority (GMMRA)<br />
<strong>Site:</strong> Tarhuna</p>
<p><strong>Description:</strong> Modification, programming, testing, commissioning and startup of PLC and communication system between 2 main water storage tanks. Communication was done through SITOP Modules over copper cable spanning a distance of approximately 10km. System also consisted of various flowmeters, level transmitters and pressure transmitters.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Gas Compressor Control System<br />
<strong>Client:</strong> Chemical Factory<br />
<strong>Site:</strong> Abu Khamash</p>
<p><strong>Description:</strong> Design, Installation, testing and commissioning of a control system for a gas compressor system. Control system comprised of Step 7 400 PLC with OP71 HMI panel, and various instrumentation products.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
]]></content:encoded>
			<wfw:commentRss>https://www.alshoala.net/reference-template/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Other Areas</title>
		<link>https://www.alshoala.net/other-areas/</link>
		<comments>https://www.alshoala.net/other-areas/#comments</comments>
		<pubDate>Tue, 15 Apr 2014 18:22:19 +0000</pubDate>
		<dc:creator><![CDATA[alshoala]]></dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.alto.rs/alshoala/?p=295</guid>
		<description><![CDATA[Project Title:  Akakus Fire Detection System at CCX Al Sharara Client:  Akakus Oil Operation Site: Al Sharara Oil Field, Libya Date: 2022 Description: CCX at Al Sharara Field is a main accommodation object for all GOSPs in the field. It consists of several common buildings and numerous accommodation buildings. Goal of the project was replacement...]]></description>
				<content:encoded><![CDATA[<p><!--StartFragment--></p>
<p><strong>Project Title:</strong>  Akakus Fire Detection System at CCX Al Sharara<br />
<strong>Client:</strong>  Akakus Oil Operation<br />
<strong>Site:</strong> Al Sharara Oil Field, Libya<br />
<strong>Date:</strong> 2022</p>
<p><strong>Description:</strong> CCX at Al Sharara Field is a main accommodation object for all GOSPs in the field. It consists of several common buildings and numerous accommodation buildings. Goal of the project was replacement of existing nonfuncitional system with the new one from Siemens. Major chalange was lack of AsBuilt documentation for the preivious system. Site has main FC2080 panel with 16 loops, one indicator panel FC2020 in the fire station and additional FC2020 panel in the nearby Airport building connected to the main site using FO.</p>
<p><strong>Technology used: </strong>Siemens FC2080 and FC2020 Sinteso fire detection panels.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><!--EndFragment--></p>
<p><strong>Project Title:</strong>  LISCO The New Bar Mill Maintenance<br />
<strong>Client:</strong>  LISCO<br />
<strong>Site:</strong> Misurata, Libya<br />
<strong>Date:</strong> 2022</p>
<p><strong>Description:</strong>  Following system startup in 2017, working in the extreamly harsh industrial environment and without regular premptive maintenance, system degraded with several loops damaged and several extinguishing systems in fault state. Our goal was to bring system to the operational state by exchanging demaged equipment, fixing minor cabling issues and repositioning some XC10 units.</p>
<p><strong>Technology used: </strong>Siemens Sinteso FC2060, XC10.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong>  Replacement of the fire detection system in West Mountain Power Plant<br />
<strong>Client:</strong>  GECOL<br />
<strong>Site:</strong> Power Plant, Ruez, Libya<br />
<strong>Date:</strong> October 2021</p>
<p><strong>Description:</strong>  Alshoala was tasked to procure equipment, install and commission a new fire detection system in the West Mountain power plant. The system is based on the latest fire panel from Siemens – Sinteso and fire detectors of the same series. Following procurement and installation of the system earlier this year we have done commissioning in October. This project will be followed by already contracted commissioning of DesigoCC, Siemens designated Fire detection SCADA system for graphical monitoring of the fire system in the Power Plant.</p>
<p><strong>Technology used: </strong>Siemens Sinteso FC2060.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Extension of DCS for monitoring fire detection systems<br />
<strong>Client:</strong> Siemens Kuwait<br />
<strong>Site:</strong> Shuwakh water resources, Kuwait<br />
<strong>Date:</strong> May 2021</p>
<p><strong>Description:</strong>  Following our initial project from three years ago for the design and commissioning of the DCS system for monitoring fire detection and power management on 28 remote sites throughout Kuwait, we have extended this system with one more site. As before, the new system is based on Siemens S7-1200 PLC.</p>
<p><strong>Technology used:</strong><!--StartFragment-->Siemens S7-1200, HMI panels, 5 Siemens IPC, SCADA WinCC, DNP3, Ruggedcom switches, SCALANCE M874-3 and SCALANCE S612 for VPN.<!--EndFragment--></p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Commissioning of Siemens gas turbines at South Tripoli power plant<br />
<strong>Client:</strong> GECOL<br />
<strong>Site:</strong> Tripoli<br />
<strong>Date:</strong> July 2020</p>
<p><strong>Description:</strong> Gecol has procured 2 gas turbines from Siemens, but on our first survey we found turbines not working and without software and configuration. PCS 7 system has not been configured properly so online support from Siemens could not solve issues on site online. Alshoala Engineering Company has reconfigured the terminal and plant level of the DCS system and enabled future works. We successfully commissioned one turbine and added it to the grid. The other turbine control system for water cooling was damaged in the fire. Our company erected a new shelter, procured equipment, installed and commissioned a new control system and connected it to the existing system. Once works on the cooling control system have been finished we successfully commissioned the second Siemens turbine.</p>
<p><strong>Technology used:</strong> PCS 7, Siemens PLCs from S7-1200 series.</p>
<p><strong>Importance of the site: </strong>Current power situation in Libya is very hard and additional 2&#215;40 MW of power has a good impact on the welfare of all Libyans.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> DCS for monitoring fire detection systems in different areas of Kuwait<br />
<strong>Client:</strong> Siemens Kuwait<br />
<strong>Site:</strong> Control room and 28 sites of Ministry of Electricity and Water in Kuwait<br />
<strong>Date:</strong> August 2018</p>
<p><strong>Description: </strong>Design and commissioning of DCS system for monitoring fire detection and power management on 28 remote sites throughout Kuwait. Systems is consisted of 28 RTU cabinets each equipped with Siemens S7-1200 PLC and needed IO and communication cards and control room RACK with redundant servers, historian server and 2 operation stations. Goal of the project was to interconnect non-Siemens fire detection panels that featured printer output to Siemens PLC, to process received data and to transmit results from PLC to the control room servers using 4G mobile communication. VPN from each site to the control room was established through 4G mobile network, running DNP3 protocol for data transmission. WinCC SCADA was used for remote visualization of events (alarms and faults from Fire detection systems), while each site had dedicated 17’’ HMI panel for local visualization. System also provided interconnection with Computerized Maintenance Management System (CMMS), informing client’s technical department in case of faults on any fire detection system. Client has possibility to access SCADA also through any other remote device using Siemens Web Navigator. As additional request and pilot project on a single site we have also connected power meter to RTU panel enabling power monitoring and visualization, improving power management of the site.</p>
<p>Commissioning of additional necessary software and hardware such as video walls, printers, time synchronisation, UPS and power redundancy was also part of our work to meet the needs of our client. <a href="http://www.alshoala.net/wp-content/uploads/2019/05/Completion-Certificate-ALSHOALA.pdf">Completion Certificate- ALSHOALA</a>.</p>
<p style="text-align: center;"><a href="https://www.facebook.com/plugins/video.php?href=https%3A%2F%2Fwww.facebook.com%2F2352475011746202%2Fvideos%2F2402384933329411%2F&amp;show_text=0&amp;width=560"><img class="wp-image-1459 aligncenter" src="http://www.alshoala.net/wp-content/uploads/2019/09/Kuwait.jpg" alt="Kuwait" width="228" height="160" /></a>Opening ceremony video</p>
<p><strong>Technology used: </strong>Siemens S7-1200, HMI panels, 5 Siemens IPC, SCADA WinCC, DNP3, Ruggedcom switches, SCALANCE M874-3 and SCALANCE S612 for VPN.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Commissioning of fire detection system in the New Bar Mill<br />
<strong>Client:</strong> LISCO<br />
<strong>Site:</strong> Misurata<br />
<strong>Date:</strong> August 2017</p>
<p><strong>Description:</strong> Commissioning of fire detection system and 13 extinguishing control systems inside new bar mill plant. Fire detection system has 10 addressable loops. Nitrogen is used as extinguishing agent. Plant also has 6 water extinguishing systems that are controlled and monitored from the fire detection panel. Alshoala Engineering Company provided support for diagnostics of faulty components, its replacement, testing and commissioning of the system.</p>
<p><strong>Technology used:</strong> Siemens Sinteso FS2060 FDS, Siemens XC10 extinguishing panels, different addressable and collective detectors.</p>
<p><strong>Importance of the site: </strong>LISCO is major Iron and Steel producer in Libya. Startup of the New bar mill, as a huge new factory, was dependent only on the commissioning of the Fire Detection System.</p>
<p>&nbsp;</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div><!--StartFragment--></p>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Upgrade of water treatment station in cement factory<br />
<strong>Client:</strong> Alahlia Cement Factory<br />
<strong>Site:</strong> Tripoli<br />
<strong>Date:</strong> December 2017</p>
<p><strong>Description:</strong> Migration from the old 115u unit to Siemens S7-1200 with WINCC SCADA. Work had to be done within 24 hours. System was previously altered several times without updating documentation so the new program and wiring was needed to have the station up and running.</p>
<p>&nbsp;</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Exchange of cement mill drive<br />
<strong>Client:</strong> Alahlia Cement Factory<br />
<strong>Site:</strong> Tripoli<br />
<strong>Date:</strong> February 2017</p>
<p><strong>Description:</strong> Replacement of existing mill control circuit with DC drive connected to PLC through profibus with HMI. Work was done within 72 hours, during mill shutdown, as production line has only two mills.</p>
<p>&nbsp;</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><!--EndFragment--></p>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Burj Bulayla Twin Towers Phase B<br />
<strong>Client:</strong> Tadamon for Real-estate Investment<br />
<strong>Site:</strong> Tripoli<br />
<strong>Date:</strong> March 2016</p>
<p><strong>Description:</strong> Installation of the new control system for tower&#8217;s water pump station based on Siemens PLCs and TP400 HMIs. Installation and programming of inverters. PID technology was used in PLC programming in order to maintain stable water supply for all floors. New SCADA system was installed for operation and monitoring of water pumps system at the control room.</p>
<p><strong>Technology used:</strong> PLC S7-1200, HMI KTP 400, WinCC SCADA, Inverters</p>
<p><strong>Importance of the site: </strong>Twin Towers are one of the largest skyscrapers in Tripoli as well as one of the main town&#8217;s landmarks.</p>
<p>&nbsp;</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Burj Bulayla Twin Towers Phase A<br />
<strong>Client:</strong> Tadamon for Real-estate Investment<br />
<strong>Site:</strong> Tripoli<br />
<strong>Date:</strong> February 2016</p>
<p><strong>Description:</strong> Upgrade of Power Management Software and test working status of all units of the two towers.</p>
<p>&nbsp;</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p>&nbsp;</p>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Upgrade of carton baler controller<br />
<strong>Client:</strong> West Carton Baling Company<br />
<strong>Site:</strong> Tripoli<br />
<strong>Date:</strong> October 2016</p>
<p><strong>Description:</strong> Replacement of faulty Mitsubishi PLC with the new Siemens S7-1200. Client did not have wiring plan nor operating sequence so both wiring and programming were made from scratch.</p>
<p>&nbsp;</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> SCADA controlled mixer unit<br />
<strong>Client:</strong> Alkala Soap &amp; Detergent Factory<br />
<strong>Site:</strong> Tripoli</p>
<p><strong>Description:</strong> Re-writing software and designing new SCADA system for Mixer unit inside Alkala Soap &amp; Detergent Factory.</p>
<p>&nbsp;</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Upgrade of Wire Drawing Machine<br />
<strong>Client:</strong> General Company for wires and electrical products<br />
<strong>Site:</strong> Benghazi</p>
<p><strong>Description:</strong> Project includes the overhaul of wire drawing machine control system, including the replacement of the main drive, capstan drive and spooler drive. System consisting of S7-300 CPU with ET200S remote I/O’s connected through Profibus network. HMI KTP 1000 basic color panel earmarked for operator interface.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Electrical Infrastructure Network SCADA System<br />
<strong>Client:</strong> Tripoli Medical Centre<br />
<strong>Site:</strong> Tripoli</p>
<p><strong>Description:</strong> Design, engineering, supply and installation of a SCADA system covering all HV &amp; LV substations within the hospital campus. All substations were connected in a ring configuration through a fiber backbone. Monitoring and control of stations is done through the main control room. Project also included the design and installation of an automatic changeover system, between mains power and backup generators.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Wire Insulation Machine Control System<br />
<strong>Client:</strong> General Company for wires and electrical products<br />
<strong>Site:</strong> Benghazi Factory</p>
<p><strong>Description:</strong> Total overhaul of insulation machine control system. Works included the design, installation, programming, testing, commissioning and startup. Equipment installed included Simatic Step 7 300 CPU, 7x DC Motors, 1x AC Motor, Temperature Controller, 1x ET200S, 2x ET200M and 2 PID Temperature Controllers. All motors and remote I/O’s were connected through a Profibus network. HMI through KTP1000 Basic Color Panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Silo Automation and Control Project<br />
<strong>Client:</strong> Tripoli Feed Mill Company<br />
<strong>Site:</strong> Flour Mill Silos, Tripoli</p>
<p><strong>Description:</strong> Complete design, installation, programming, testing, commissioning and startup of a loading and storage silo system, with approximately 3,000 Inputs and Outputs. Equipment installed included Simatic Step 7 319 CPU with 13x ET-200M Remote I/Os connected through a Profibus Network, HMI and visualization through MIMIC panel and WinCC SCADA software.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Trimming and Beading Machine Control Project<br />
<strong>Client:</strong> Garian Cylinder Tank Factory<br />
<strong>Site:</strong> Garian</p>
<p><strong>Description: </strong>Design, installation, programming, testing and commissioning of a control system for a Trimming and Beading machine, producing gas cylinders. Hardware used consisted of a Main Controller Simatic Step 7 300 CPU, with an OP71 panel for the HMI.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Plastic Mixer Machine Control System<br />
<strong>Client:</strong> Electrical Products Manufacturing Company, Tripoli<br />
<strong>Site:</strong> Tripoli Factory</p>
<p><strong>Description: </strong>Design, installation, testing and commissioning of a control system for a plastic mixer machine. Control system comprised of Step 7 300 PLC with OP71 HMI panel, and various instrumentation products.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Gas Compressor Control System<br />
<strong>Client:</strong> Chemical Factory<br />
<strong>Site:</strong> Abu Khamash</p>
<p><strong>Description:</strong> Design, installation, testing and commissioning of a control system for a gas compressor system. Control system comprised of Step 7 400 PLC with OP71 HMI panel, and various instrumentation products.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Pressing Machine Control System Development<br />
<strong>Client:</strong> Aman Company for tire<br />
<strong>Site: </strong>Tajora, Libya</p>
<p><strong>Description:</strong> Design, installation, programming, testing, commissioning and startup of control system for 12x Pressing Machines. Hardware included Simatic S7 300 PLC w/TP177A HMI panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Calender Machine Control System Development<br />
<strong>Client:</strong> Aman Company for tire<br />
<strong>Site: </strong>Tajora, Libya</p>
<p><strong>Description:</strong> Design, installation, programming, testing, commissioning and startup of a SCADA and control system for a calender machine. Hardware included Simatic S7 300 PLC, SIEI DC Motor Drive, ET 200S Remote I/O, Thickness Calculator, Radioactive Scanner and TP177B HMI, equipment connected on a Profibus network. Visualization through WinCC SCADA using WinAC S/W installed on Siemens Industrial PC.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Rubber Weighing Control System Development<br />
<strong>Client:</strong> Aman Company for tire<br />
<strong>Site: </strong>Tajora, Libya</p>
<p><strong>Description:</strong> Design, installation, programming, testing, commissioning and startup of a SCADA and control system for Rubber Weighing machine. Hardware included Simatic S7 300 PLC w/TP277 HMI panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Rubber Mixer Control System Development<br />
<strong>Client:</strong> Aman Company for tire<br />
<strong>Site: </strong>Tajora, Libya</p>
<p><strong>Description:</strong> Design, installation, programming, testing, commissioning and startup of control and SCADA system for Rubber Mixer machine. Hardware included Simatic S7 300 PLC, SIEI DC Drive, w/TP177B HMI panel, equipment connected on a Profibus network.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Conveyor Control System Development<br />
<strong>Client:</strong> Aman Company for tire<br />
<strong>Site: </strong>Tajora, Libya</p>
<p><strong>Description:</strong> Design, installation, programming, testing, commissioning and startup of control system for various conveyors. Hardware included Simatic S7 300 PLC, SIEI DC Drive, w/OP37 HMI panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Plastic Mixer Control System Development<br />
<strong>Client:</strong> Aman Company for tire<br />
<strong>Site: </strong>Tajora, Libya</p>
<p><strong>Description:</strong> Design, installation, programming, testing, commissioning and startup of control system for Rubber Mixer machine. Hardware included Simatic S7 300 PLC, SIMOREG DC Drive, w/TP177A HMI panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Wire Drawing Machine Control System Development<br />
<strong>Client:</strong> General Company for wires and electrical products Benghazi<br />
<strong>Site: </strong>Benghazi, Libya</p>
<p><strong>Description:</strong> Design, installation, programming, testing, commissioning and startup of control system for Wire Drawing Machine. Hardware included Simatic S7 300 PLC, SIEI DC Drive, w/TP177B HMI panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Mechanical Filter Control System Development<br />
<strong>Client:</strong> Libyan Cement Company<br />
<strong>Site: </strong>Benghazi, Libya</p>
<p><strong>Description:</strong>Design, installation, programming, testing, commissioning and startup of control system for a Mechanical Filter. Hardware included Simatic S7 300 PLC, w/OP3 HMI panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Pressing Machine Control System Development<br />
<strong>Client:</strong> Aman Company for tire<br />
<strong>Site: </strong>Tajora, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for a Pressing Machine. Hardware included Simatic S7 300 PLC, w/OP7 HMI panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Autopack Machine Control System Development<br />
<strong>Client:</strong> Libyan Cement Company<br />
<strong>Site: </strong>Benghazi, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for an Autopack Machine. Hardware included Simatic S7 300 PLC, w/TP177B HMI panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Blow Molding Machine Control System Development<br />
<strong>Client:</strong> Alawafe for Water<br />
<strong>Site: </strong>Tripoli, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for a Blow Molding machine. Hardware included Simatic S7 300 PLC main controller with various I/P &amp; O/P Cards.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Traversing System Control System Development<br />
<strong>Client:</strong> General Company for wires and electrical products Benghazi<br />
<strong>Site: </strong>Benghazi, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for a Traversing machine. Hardware included Simatic S7 300 PLC main controller and SIMOREG DC drive.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Printing Machine programming project<br />
<strong>Client: </strong>Alawafe for Water<br />
<strong>Site: </strong>Tripoli, Libya</p>
<p><strong>Description:</strong>Re-programming, testing, commissioning and startup of control system for a printing machine. Hardware included Simatic S7 300 PLC main controller.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> 18L filling machine control system development project<br />
<strong>Client:</strong> Alsafia for Water<br />
<strong>Site: </strong>Tripoli, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for a printing machine. Hardware included Simatic S7 200 PLC main controller.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> 1.5L filling machine control system development project<br />
<strong>Client:</strong> Alzahra for Water<br />
<strong>Site: </strong>Tripoli, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for a water bottling machine. Hardware included Simatic S7 200 PLC main controller.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Dough cutting and transporting machine control system development project<br />
<strong>Client:</strong> Alsonbola for biscuit production<br />
<strong>Site: </strong>Tripoli, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for a dough cutting and transporting machine. Hardware included Simatic S7 200 PLC main controller w/TP177B HMI panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Biscuit line production project<br />
<strong>Client:</strong> Alsonbola for biscuit production<br />
<strong>Site: </strong>Tripoli, Libya</p>
<p><strong>Description: </strong>Installation and re-programming of control system for a biscuit production line. Hardware included Simatic S7 300 PLC main controller, w/OP7 HMI.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Wire Machine control system development project<br />
<strong>Client:</strong> Aman Company for tire<br />
<strong>Site: </strong>Tajora, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for a wiring machine. Hardware included Simatic S7 200 PLC main controller w/OP7 HMI panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Comparator devices development project<br />
<strong>Client:</strong> Aman Company for tire<br />
<strong>Site: </strong>Tajora, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing &amp; commissioning of comparator devices. Hardware included Simatic S7 200 PLC main controller.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Wire insulating machine control system development project<br />
<strong>Client:</strong> General Company for Wires and electrical products<br />
<strong>Site: </strong>Benghazi, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of a control system for a wire insulating machine. Hardware included Simatic S7 300 PLC main controller, and SIMOREG DC drive.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Filling Machine control system development project<br />
<strong>Client:</strong> Alsafa Company for milk production<br />
<strong>Site: </strong>Tripoli, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for a milk filling machine. Hardware included Simatic S7 200 PLC main controller, Micromaster AC drive and OP3 HMI.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Blow Molding Machine control system development project<br />
<strong>Client: </strong>Alzahra factory for water<br />
<strong>Site: </strong>Tripoli, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for a blow molding machine. Hardware included Simatic S7 300 PLC main controller, w/OP7 HMI.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Packing machine programming and development project<br />
<strong>Client:</strong> Alzahra factory for water<br />
<strong>Site: </strong>Jafara, Libya</p>
<p><strong>Description: </strong>Re-Programming, testing, commissioning and startup of control system for a bottle packing machine. Hardware included Simatic S7 300 PLC main controller, SIMOREG DC Drive w/OP37 HMI.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Blow Molding Machine control system development project<br />
<strong>Client:</strong> Fazan Factory for water<br />
<strong>Site: </strong>Sabha, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for a blow molding machine. Hardware included Simatic S7 300 PLC main controller, SIMOREG DC Drive w/OP37 HMI.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Rubber Extruder Machine control system development project<br />
<strong>Client:</strong> Aman Company for tire<br />
<strong>Site: </strong>Tajora, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for a rubber extruder machine. Hardware included Simatic S7 300 PLC main controller, SIMOREG DC drive and OP37 HMI.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Hydraulic cutting machine control system development project<br />
<strong>Client:</strong> Aman Company for tire<br />
<strong>Site: </strong>Tajora, Libya</p>
<p><strong>Description: </strong>Design, installation, programming, testing, commissioning and startup of control system for a hydraulic cutting machine. Hardware included Simatic S7 300 PLC main controller and OP7 HMI.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
]]></content:encoded>
			<wfw:commentRss>https://www.alshoala.net/other-areas/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Water Treatment</title>
		<link>https://www.alshoala.net/water-treatment/</link>
		<comments>https://www.alshoala.net/water-treatment/#comments</comments>
		<pubDate>Tue, 15 Apr 2014 18:22:01 +0000</pubDate>
		<dc:creator><![CDATA[alshoala]]></dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.alto.rs/alshoala/?p=293</guid>
		<description><![CDATA[Project Title: Procurement and installation of acoustic flowmeters Client: MMRA Sites: Tazerbo, Sirt, Sarir, Ajdabya and Solouk Description: Alshoala procured custom made acoustic flow meters from Siemens in 2013, but due to the security situation, they have not been installed for several years. In November 2018 our engineers visited all of the sites, carried out all needed mechanical and...]]></description>
				<content:encoded><![CDATA[<p><strong>Project Title:</strong> Procurement and installation of acoustic flowmeters<br />
<strong>Client:</strong> MMRA<br />
<strong>Sites:</strong> Tazerbo, Sirt, Sarir, Ajdabya and Solouk</p>
<p><strong>Description:</strong> Alshoala procured custom made acoustic flow meters from Siemens in 2013, but due to the security situation, they have not been installed for several years. In November 2018 our engineers visited all of the sites, carried out all needed mechanical and electrical works and successfully commissioned procured acoustic flow meters.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> PCS 7 for Man Made River (Tarhona-Aboyaian) Pump station<br />
<strong>Client:</strong> GMMRA<br />
<strong>Site:</strong> Garian</p>
<p><strong>Description:</strong> Reprogramming of control system in order to replace corrupted/faulty existing program. DCS is based on Siemens PCS7 and has upgraded operational and management capabilities with one engineering and three client stations. New communication network between pump station 1, pump station 2 and reservoir was established using 3 Siemens SCALANCE switches.</p>
<p><strong>Importance of the Site: </strong>This site is providing 800.000 cubic meters of water per day for the large part of western Libya.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Replacement of Motor Drives and Control System for Water Treatment Plant<br />
<strong>Client:</strong> Tripoli Medical Centre<br />
<strong>Site:</strong> Tripoli</p>
<p><strong>Description:</strong> Project includes the replacement of two Motor Drives (Siemens G150 Convertors) for 350kW motors, including the engineering, supply and installation of a new control system and associated HMI.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Extension of water pipeline control system<br />
<strong>Client:</strong> Great Man Made River Authority (GMMRA)<br />
<strong>Site:</strong> Benghazi</p>
<p><strong>Description:</strong> Design of an extension to the existing control system for a water conveyance system, including the erection of a new Local Control Centre, complete with all telecommunication systems, computer room environment including ELV systems such as Access Control, Fire Alarm and suppression, structured cabling system and remote system monitoring.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Forbay Water Storage Tank Automation and Control System<br />
<strong>Client:</strong> Great Man Made River Authority (GMMRA)<br />
<strong>Site:</strong> Benghazi</p>
<p><strong>Description:</strong> Complete design, installation, programming, testing, commissioning and startup of the Forbay Tank SCADA and Automation System. Hardware used included Simatic Step 7 300 CPU, 3x ET200S Remote I/Os, 2xET200M Station, 1x Pressure Transmitter, 2x Ultrasonic level transmitters, 2x Level Switches, 1x Electromagnetic Flowmeter, 2x Rotork Actuator Valves and 3x Huma valves. HMI through KTP1000 Basic Color Panel 10”.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Sewage Pumping Station Control System<br />
<strong>Client:</strong> DS Construction<br />
<strong>Site:</strong> Garian</p>
<p><strong>Description:</strong> Complete design, installation, programming, testing, commissioning and startup of a Sewage pumping station control system. Hardware used included Simatic Step 7 1200 CPU, 8x Soft starters 6x 75kW &amp; 2x 11kW. HMI through KTP600 Basic Color Panel.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Sewage Treatment Plant Control System<br />
<strong>Client:</strong> Wabag<br />
<strong>Site:</strong> Tobruk STP</p>
<p><strong>Description:</strong> Programming, Modification, commissioning and startup of control system for 3 pumping stations and treatment plant. Each pumping station equipped with the following hardware: Step 7 300 main controller, pressure transmitters, level transmitters and soft starters. Main Treatment plant divided in 6 areas, connected through fiber optic cabling.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Tarhona Agricultural Water Utilization Project<br />
<strong>Client:</strong> Great Man Made River Authority (GMMRA)<br />
<strong>Site:</strong> Tarhona</p>
<p><strong>Description:</strong> Modification, programming, testing, commissioning and startup of PLC and communication system between 2 main water storage tanks. Communication was done through SITOP Modules over copper cable spanning a distance of approximately 10km. System also consisted of various flowmeters, level transmitters and pressure transmitters.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Sewage Pumping Station Control Panel<br />
<strong>Client:</strong> DS Construction<br />
<strong>Site:</strong> Guffra</p>
<p><strong>Description: </strong>Design, Installation, testing and commissioning of a sewage control panel consisting of 4 soft starters rated at 12kW each. Main controller Step 7 1200 w/Basic Color Panel KTP 600 HMI.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
]]></content:encoded>
			<wfw:commentRss>https://www.alshoala.net/water-treatment/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Write us an e-mail</title>
		<link>https://www.alshoala.net/write-us-an-e-mail/</link>
		<comments>https://www.alshoala.net/write-us-an-e-mail/#comments</comments>
		<pubDate>Tue, 15 Apr 2014 13:03:56 +0000</pubDate>
		<dc:creator><![CDATA[alshoala]]></dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.alto.rs/alshoala/?p=288</guid>
		<description><![CDATA[Name: *FirstLastE-mail: *Subject:Message:type_submit_reset_5SubmitReset]]></description>
				<content:encoded><![CDATA[<div><script type="text/javascript">// before form is load
function before_load()
{	
}	
// before form submit
function before_submit()
{
}	
// before form reset
function before_reset()
{
}      </script><style>#form1 .wdform_td1 input {
-webkit-box-sizing: content-box;
-moz-box-sizing: content-box;
box-sizing: content-box;
}#form1 
.wdform_table1, #form1 .wdform_table1 table, #form1 .wdform_table1 tr, #form1 .wdform_table1 th{
	padding-top:inherit !important;
	padding-bottom:inherit !important;
	margin:inherit !important;
	line-height:1 !important;
	border-collapse:separate !important;
	padding-right:inherit;
	padding-left:inherit;
	font-size:12px !important;
}#form1 
.wdform_table2, #form1 .wdform_table2 table, #form1 .wdform_table2 tr, #form1 .wdform_table2 th{
	width:inherit !important;
	vertical-align:top !important;
}#form1 
.wdform_table2 table{
	border-width:inherit !important;
}#form1 
.wdform_table2{
float: left;
}#form1 
.ch_rad_label{
	color:#000 !important;
}#form1 
.wdform_page_button{
	max-width:inherit !important;
}#form1 
.wdform_table2 td{
	text-align:left !important;
	border-width:inherit !important;
}#form1 
.wdform_address select{
	font-size:12px !important;
}#form1 
.label{
	font-size:14px !important;
	color:#000 !important;
}#form1 
table.wdform_table1, #form1 .wdform_table1 table{
	border:0px !important;
}#form1 
.wdform_table2 td{
	border-width:inherit !important;
	vertical-align:top !important;
}#form1 
.wdform_table1 table, #form1 .wdform_table1 tbody{
	border-collapse:separate !important;
}#form1 
.wdform_table1 td{
	text-align:left;
	font-size:12px !important;
	border-collapse:separate !important;
	line-height:1 !important;
	border:0px none !important;
	padding-bottom:2px;
	padding-top:2px;
	padding-left:inherit !important;
	padding-right:inherit !important;
	vertical-align:middle;
	margin:inherit !important;
}#form1 
.wdform_table1 span{
	vertical-align:top !important;
}#form1 
.label{
	font-family: 'Lucida Grande', Tahoma, Arial, Verdana, sans-serif !important;
}#form1 
.wdform_date{
	width:100px !important;
}#form1 
.mini_label{
	color:#000 !important;
}#form1 
.wdform_table1 input, #form1 .wdform_table1 textara{
		font-size:14px;
		-webkit-transition: all 0.0s linear;
		background-color:#FFF !important;
		background:#FFF !important;
		line-height:1 !important;
		font-size:inherit !important; 
		display:inline !important;
		margin-top:0px !important;
		margin-bottom:0px !important;
		padding-top:0px ;
		padding-bottom:0px;
		color:#000;
}#form1 
.wdform_table1 img{
	max-width:inherit !important;
}#form1 
.wdform_table1 select{
	font-size:14px;
	margin-bottom:inherit !important;
	margin-top:inherit !important;
	line-height:1 !important;
	font-size:inherit !important; 
	height:inherit !important;
	display:inline !important;
}#form1 
.wdform_table1 button{
	margin:1px !important;
}#form1 
.form_view
{
font-size:14px !important;
font-weight:normal !important;
color:#000000 !important;
}#form1 
.wdform_table1 button
{
cursor:pointer !important;
}#form1 
.no_spacing
{
padding-right:50px !important;
float:left !important;
border-spacing: 0px !important;
border-collapse:separate !important;
}#form1 
.time_box
{
border-width:1px !important;
margin: 0px !important;
padding: 0px !important;
text-align:right !important;
width:30px !important;
vertical-align:middle
}#form1 
.mini_label
{
font-size:10px !important;
font-family: 'Lucida Grande', Tahoma, Arial, Verdana, sans-serif !important;
}#form1 
.ch_rad_label
{
display:inline !important;
margin-left:5px !important;
margin-right:15px !important;
float:none !important;
}#form1 
.label
{
border:none !important;
}#form1 
.td_am_pm_select
{
padding-left:5 !important;
}#form1 
.am_pm_select
{
height: 18px !important;
margin:0 !important;
padding:0
}#form1 
.input_deactive
{
color:#999999 !important;
font-style:italic !important;
border-width:1px !important;
margin: 0px !important;
padding: 0px
}#form1 
.input_active
{
color:#000000 !important;
font-style:normal !important;
border-width:1px !important;
margin: 0px !important;
padding: 0px
}#form1 
.required
{
border:none !important;
color:red
}#form1 
.captcha_img
{
border-width:0px !important;
margin: 0px !important;
padding: 0px !important;
cursor:pointer !important;
}#form1 
.captcha_refresh
{
width:18px !important;
border-width:0px !important;
margin: 0px !important;
padding: 0px !important;
vertical-align:middle !important;
cursor:pointer !important;
}#form1 
.captcha_input
{
height:20px !important;
border-width:1px !important;
margin: 0px !important;
padding: 0px !important;
vertical-align:middle !important;
}#form1 
.file_upload
{
border-width:1px !important;
margin: 0px !important;
padding: 0px
}#form1     
.page_deactive
{
border:1px solid black !important;
padding:4px 7px 4px 7px !important;
margin:4px !important;
cursor:pointer !important;
background-color:#DBDBDB !important;
}#form1 
.page_active
{
border:1px solid black !important;
padding:4px 7px 4px 7px !important;
margin:4px !important;
cursor:pointer !important;
background-color:#878787 !important;
}#form1 
.page_percentage_active
{
padding:0px !important;
margin:0px !important;
border-spacing: 0px !important;
height:30px !important;
line-height:30px !important;
background-color:yellow !important;
border-radius:30px !important;
font-size:15px !important;
float:left !important;
text-align: right !important; 
}#form1 
.page_percentage_deactive
{
height:30px !important;
line-height:30px !important;
padding:5px !important;
border:1px solid black !important;
width:100% !important;
background-color:white !important;
border-radius:30px !important;
text-align: left !important; 
}#form1 
.page_numbers
{
font-size:11px !important;
}#form1 
.phone_area_code
{
width:50px !important;
}#form1 
.phone_number
{
width:100px !important;
}#form1 
.wdform_percentage_title
{
padding-left:20px
}#form1 
span.wdform_page_button
{
cursor:pointer !important;
}#form1 
.wdform_scale_rating table input
{
margin:0 2px;
}#form1 

.wdform_grading input
{
margin:0 0 3px;
}#form1 

.ui-slider-handle:hover
{
background:none;
border-radius:0px !important;
}#form1 

.ui-slider-handle:focus{
background:#FFFFFF;
border-radius:0px !important;
}#form1 

.ui-slider-handle
{
border-radius:0px !important;
}#form1 

.ui-slider
{
border:1px solid #999;
border-radius:0px !important;
}#form1 

.matrix_ 
{
padding:4px 0;
}#form1 

.ui-spinner-button:hover
{
background:transparent;
}#form1 

.ui-icon:hover
{
color:#000000;
}#form1 

.ui-spinner-input:focus
{
outline: none;
border:none !important;
}#form1 

.ui-spinner
{
margin-right:3px !important;
border-radius:0px !important;
}#form1 

.ui-spinner-button
{
border-radius:0px !important;
}#form1 

.matrix_ 
{
padding:4px 0;

}#form1 

.matrix_ label
{
color:#000000;
}#form1 

.wdform_matrix table
{
border-collapse: separate !important;

}#form1 

.wdform_matrix table td
{
border:1px solid #999;

}#form1 

.wdform_matrix table tr:first-child td:first-child
{
border:none;
}#form1 

.wdform_matrix table input
{
border:none;
margin:5px 7px;
}#form1 

.wdform_matrix table select
{
margin:5px 7px;
padding:1px;
}#form1 
</style><form name="form1" action="/feed/" method="post" id="form1" enctype="multipart/form-data"  onsubmit="check_required('submit', '1'); return false;">
		<div id="1pages" class="wdform_page_navigation" show_title="false" show_numbers="true" type="none"></div>
		<input type="hidden" id="counter1" value="7" name="counter1" />
        
        
        
        
        
        
        
        
        
        
        
        
        
        <table class="wdform_table1" style="border-top:0px solid black;" cellpadding="4" cellspacing="0"><tbody id="1form_view1" class="wdform_tbody1" page_title="Untitled page" next_title="Next" next_type="button" next_class="wdform_page_button" next_checkable="false" previous_title="Previous" previous_type="button" previous_class="wdform_page_button" previous_checkable="false"><tr class="wdform_tr1"><td class="wdform_td1"><table class="wdform_table2"><tbody class="wdform_tbody2"><tr id="6" type="type_name"><td class="" id="6_label_section1" align="left" valign="top"><span class="label" id="6_element_label1">Name:</span><span class="required" id="6_required_element1"> *</span></td><td class=" toolbar_padding" id="6_element_section1" align="left" valign="top"><input id="6_type1" name="6_type1" value="type_name" type="hidden"><input id="6_required1" name="6_required1" value="yes" type="hidden"><input id="6_unique1" name="6_unique1" value="no" type="hidden"><table id="6_table_name" cellpadding="0" cellspacing="0"><tbody><tr id="6_tr_name1"><td id="6_td_name_input_first"><input onchange="change_value('6_element_first1')" onblur="return_value(&quot;6_element_first1&quot;)" onfocus="delete_value(&quot;6_element_first1&quot;)" title="" value="" name="6_element_first1" id="6_element_first1" style="margin-right: 10px; width: 200px;" class="input_deactive" type="text"></td><td id="6_td_name_input_last"><input onchange="change_value('6_element_last1')" onblur="return_value(&quot;6_element_last1&quot;)" onfocus="delete_value(&quot;6_element_last1&quot;)" title="" value="" name="6_element_last1" id="6_element_last1" style="margin-right: 10px; width: 200px;" class="input_deactive" type="text"></td></tr><tr id="6_tr_name2"><td id="6_td_name_label_first" align="left"><label id="6_mini_label_first" class="mini_label">First</label></td><td id="6_td_name_label_last" align="left"><label id="6_mini_label_last" class="mini_label">Last</label></td></tr></tbody></table></td></tr><tr id="2" type="type_submitter_mail"><td class="" id="2_label_section1" align="left" valign="middle"><span class="label" id="2_element_label1">E-mail:</span><span class="required" id="2_required_element1"> *</span></td><td class=" toolbar_padding" id="2_element_section1" align="left" valign="middle"><input id="2_type1" name="2_type1" value="type_submitter_mail" type="hidden"><input id="2_required1" name="2_required1" value="yes" type="hidden"><input id="2_send1" name="2_send1" value="no" type="hidden"><input id="2_unique1" name="2_unique1" value="" type="hidden"><input onchange="change_value('2_element1')" onblur="return_value('2_element1')" onfocus="delete_value('2_element1')" title="" value="" name="2_element1" id="2_element1" class="input_deactive" style="width: 400px;" type="text"></td></tr><tr id="3" type="type_text"><td class="" id="3_label_section1" align="left" valign="middle"><span class="label" id="3_element_label1">Subject:</span><span class="required" id="3_required_element1"></span></td><td class=" toolbar_padding" id="3_element_section1" align="left" valign="middle"><input id="3_type1" name="3_type1" value="type_text" type="hidden"><input id="3_required1" name="3_required1" value="no" type="hidden"><input id="3_unique1" name="3_unique1" value="no" type="hidden"><input onchange="change_value(&quot;3_element1&quot;)" onblur="return_value(&quot;3_element1&quot;)" onfocus="delete_value(&quot;3_element1&quot;)" title="" value="" name="3_element1" id="3_element1" class="input_deactive" style="width: 400px;" type="text"></td></tr><tr id="4" type="type_textarea"><td class="" id="4_label_section1" align="left" valign="top"><span class="label" id="4_element_label1">Message:</span><span class="required" id="4_required_element1"></span></td><td class=" toolbar_padding" id="4_element_section1" align="left" valign="top"><input id="4_type1" name="4_type1" value="type_textarea" type="hidden"><input id="4_required1" name="4_required1" value="no" type="hidden"><input id="4_unique1" name="4_unique1" value="no" type="hidden"><textarea onchange="change_value('4_element1')" onblur="return_value('4_element1')" onfocus="delete_value('4_element1')" value="" title="" name="4_element1" id="4_element1" class="input_deactive" style="width: 400px; height: 150px;"></textarea></td></tr><tr id="5" type="type_submit_reset"><td colspan="2" class="toolbar_padding" id="5_label_and_element_section1"><table id="5_elemet_table1"><tbody><tr><td id="5_label_section1" class="" style="display: none;" align="left" valign="middle"><span id="5_element_label1" style="display: none;">type_submit_reset_5</span></td><td id="5_element_section1" class="" align="left" valign="middle"><input value="type_submit_reset" name="5_type1" id="5_type1" type="hidden"><button type="button" class="button_submit" id="5_element_submit1" value="Submit" onclick="check_required('submit', '1');">Submit</button><button type="button" class="button_reset" id="5_element_reset1" value="Reset" onclick="check_required('reset');">Reset</button></td></tr></tbody></table></td></tr></tbody></table></td></tr><tr class="wdform_footer"><td colspan="100" valign="top"><table  width="100%"><tbody><tr id="1page_nav1"></tr></tbody></table></td></tr></tbody></table>                                                                                    <script type="text/javascript">WDF_FILE_TYPE_ERROR = 'Sorry, you are not allowed to upload this type of file.';WDF_GRADING_TEXT = 'Your score should be less than';WDF_INVALID_GRADING 	= 'Your score should be less than';WDF_INVALID_EMAIL = 'This is not a valid email address.';REQUEST_URI	= "/feed/";ReqFieldMsg	='`FIELDNAME` field is required.';FormCurrency = "";FormPaypalTax = "";function formOnload1()
{
if(document.getElementById('_wd_captcha1'))
		captcha_refresh('_wd_captcha', '1');if(document.getElementById('_wd_captcha1'))
		captcha_refresh('_wd_captcha', '1');
     if (window.before_load) {
      before_load();
     }
  }
      function formAddToOnload1() {
        if (formOldFunctionOnLoad1) {
          formOldFunctionOnLoad1();
        }
        formOnload1();
      }
      function formLoadBody1() {
        formOldFunctionOnLoad1 = window.onload;
        window.onload = formAddToOnload1;
      }
      var formOldFunctionOnLoad1 = null;
      formLoadBody1();	form_view_count1=0;
	for(i=1; i<=30; i++)
	{
		if(document.getElementById('1form_view'+i))
		{
			form_view_count1++;
			form_view_max1=i;
			document.getElementById('1form_view'+i).parentNode.removeAttribute('style');
		}
	}	
	if(form_view_count1>1)
	{
		for(i=1; i<=form_view_max1; i++)
		{
			if(document.getElementById('1form_view'+i))
			{
				first_form_view1=i;
				break;
			}
		}		
		generate_page_nav(first_form_view1, '1', form_view_count1, form_view_max1);
	}
	var RecaptchaOptions = {
theme: ""
};
</script>
</form></div>
]]></content:encoded>
			<wfw:commentRss>https://www.alshoala.net/write-us-an-e-mail/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Oil &amp; Gas</title>
		<link>https://www.alshoala.net/oil-gas/</link>
		<comments>https://www.alshoala.net/oil-gas/#comments</comments>
		<pubDate>Mon, 14 Apr 2014 09:11:55 +0000</pubDate>
		<dc:creator><![CDATA[alshoala]]></dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.alto.rs/alshoala/?p=232</guid>
		<description><![CDATA[Project Title: SOC PC power plant control system upgrade Client: SOC Site: Brega Date:  2024 Status: Ongoing Description:    Another big project with Sirte Oil Company. Alshoala is tasked with complete EPC project of control system upgrade of Petrochemical power plant control system. In the scope of this project Alshoala is to replace control system...]]></description>
				<content:encoded><![CDATA[<p><!--StartFragment--></p>
<p><!--StartFragment--></p>
<p><strong><!--StartFragment--></strong></p>
<p><strong>Project Title:</strong> SOC PC power plant control system upgrade<br />
<strong>Client:</strong> SOC<br />
<strong>Site:</strong> Brega<br />
<strong>Date:</strong>  2024</p>
<p><strong>Status: Ongoing</strong></p>
<p><strong>Description:   </strong> Another big project with Sirte Oil Company. Alshoala is tasked with complete EPC project of control system upgrade of Petrochemical power plant control system. In the scope of this project Alshoala is to replace control system with the new PCS 7 control sytem from Siemens. Apart from the standard Siemens equipment: PCS7 software,  S7-410 redundant controllers and Simatic ET200SP HA IO module, in this project we are also installing instruments and CFUs as Siemens latest distributor modules for connection of existing and new instruments. For this EPC project Alshoala has prepared engineering in a form of FDS (functional design specification) and DDS (detailed design specification), and is currently procuring equipment.</p>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> SOC Methanol 1a control system upgrade<br />
<strong>Client:</strong> SOC<br />
<strong>Site:</strong> Brega<br />
<strong>Date:</strong>  2024</p>
<p><strong>Status: Ongoing</strong></p>
<p><strong>Description:  </strong>Another big project with Sirte Oil Company. Alshoala is tasked with complete EPC project of control system upgrade of Methanol 1 plant control system. In the scope of this project Alshoala is to replace control system with the new PCS 7 control sytem from Siemens. Apart from the standard Siemens equipment: PCS7 software, S7-410 redundant controllers and Simatic ET200SP HA IO module, in this project we are also installing CFUs as Siemens latest distributor modules for connection of existing and new instruments. For this EPC project Alshoala has prepared engineering in a form of FDS (functional design specification) and DDS (detailed design specification), procured several batches of equipment (cable trays, cables, Siemens equipment, etc) and is currently installing equipment on the site.</p>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> SarirOil Upgrade of HVAC control system<br />
<strong>Client:</strong> Sarir Oil Operations<br />
<strong>Site:</strong> Jakhira A91 and Nakhla A107 Oil Fields<br />
<strong>Date:</strong>  2023</p>
<p><strong>Description:  </strong>Client intended to replace existing HVAC control system. Project consisted of several control cabinets working both in parallel and as stand alone units. Our team successfully engineered new control system, procured equipment, installed and commissioned system in accordance with client’s instructions and wishes. In addition Alshaola procured and installed new MCBs and motor protections from Siemens LV department.</p>
<p><strong>Used components: </strong>8 Siemens Simatic S7-1500 units, WinCC</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> SOC Fire detection system in the New Canteen<br />
<strong>Client:</strong> SOC<br />
<strong>Site:</strong> Brega<br />
<strong>Date:</strong>  2023</p>
<p><strong>Description:  </strong>Commissioning Sintesso fire detection system. SOC fire detection is based on Siemens systems and we supported them with commissioning of the new canteen.</p>
<p><strong>Used components: </strong>Sinteso FS2020</p>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> SOC Fire detection systems<br />
<strong>Client:</strong> SOC<br />
<strong>Site:</strong> Brega<br />
<strong>Date:</strong>  2023/2024</p>
<p><strong>Description:  </strong>Commissioning of three CerberusPro Fire detection systems &#8211; One in Process Engineering and two in the Workshop Areas. SOC fire detection is based on Siemens systems and we supported them with commissioning of these three systems.</p>
<p><strong>Used components: </strong>CerberusPro FS720</p>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Harouge Amal field gas turbine<br />
<strong>Client:</strong> Harouge Oil Operation<br />
<strong>Site:</strong> Amal<br />
<strong>Date:</strong>  2023/2024</p>
<p><strong>Description:  </strong>Replacement of control system for the old gas turbine at the Amal Power plant. Replacement of DIGICON system with the latest Siemens technology based on S7-1500 CPU.</p>
<p>Despite encounering multiple technical challenges (status of the turbine) we successfully commissioned a new control system allowing Harouge to again use GT1 for the power production.</p>
<p><strong>Used components: </strong>Siemens S7-1500, WinCC</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p>&nbsp;</p>
<p><strong>Project Title:</strong> Sabratha platform upgrade<br />
<strong>Client:</strong> Mellitah<br />
<strong>Site:</strong> Sabratha platform<br />
<strong>Date:</strong>  2022/2023</p>
<p><strong>Description:  </strong>At the Sabratha platform, Alshoala has contracted migration of the Siemens WinCC software, Procurement of equipment, installation and commissioning of Siemens system upgrade as well as integration of the system with existing CMMS. The main challenge was working on the oil rig and the very limited timeframe for work during the system shutdown.</p>
<p><strong>Used components: </strong>Siemens S7-400H, Siemens S7-1500, WinCC</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> SOC Gas plant control system upgrade – Training<br />
<strong>Client:</strong> SOC<br />
<strong>Site:</strong> Brega<br />
<strong>Date:</strong>  2023</p>
<p><strong>Description: </strong>Operators training was held in Istanbul, Turkiye, for a duration of 3+4 weeks during February, March and May 2023. Participants were 16 Operators and 12 Maintenance engineers from SOC Brega Gas Plant.</p>
<p>The training covered both operation of the system and detailed information about hardware&amp;software needed for the successful maintenance of the system.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> SOC Gas plant control system upgrade – Commissioning<br />
<strong>Client:</strong> SOC<br />
<strong>Site:</strong> Brega<br />
<strong>Date:</strong>  2021-2022</p>
<p><strong>Description: </strong> The commissioning was done without the total plant shutdown and it was applied gradually in order to limit the effect of works on the production process. Therefore it lasted longer than anticipated but with no significant process disruptions. Upon the client’s request some changes are implemented during the commissioning process itself and project documentation was updated accordingly.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> SOC Gas plant control system upgrade – Wiring<br />
<strong>Client:</strong> SOC<br />
<strong>Site:</strong> Brega<br />
<strong>Date:</strong>  2021-2022</p>
<p><strong>Description: </strong> Wiring and commissioning of the working plant are not possible without the plant shutdown. Nevertheless, it was agreed with the client that this process will be applied gradually (in phases) in order to limit the effect of works on the production process. Instead of total factory shutdown, it was agreed that one by one SCC will be commissioned while keeping the factory running and taking care of the critical signals.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><!--StartFragment--></p>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><!--EndFragment--><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> SOC Gas plant control system upgrade – Instalation<br />
<strong>Client:</strong> SOC<br />
<strong>Site:</strong> Brega<br />
<strong>Date:</strong>  2021-2022</p>
<p><strong>Description: </strong>  Following successful engineering and procurement of equipment Alshoala team has finished installation of the equipment at the Gas plant in Brega. This installation consisted of the installation of new cabinets in 10 SCC (Satellite Control Centres) as well as in Main Control and Operation Centre; Installation of fiber optic cable between all sites; Installation of all procured equipment in the new rack cabinets.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> SOC Gas plant control system upgrade – Procurement<br />
<strong>Client:</strong> SOC<br />
<strong>Site:</strong> Brega<br />
<strong>Date:</strong>  2021-2022</p>
<p><strong>Description: </strong>  Following successful engineering of the system we have organized procurement of equipment. All equipment is divided into 4 batches. The first batch was Siemens LV equipment consisting of mostly Rack Cabinets and relays belonging to Siemens LV portfolio. In the second batch, we have delivered the majority of equipment from the Siemens DF portfolio – Industrial PCs, DCS controllers, IO modules and communication equipment. The third batch consisted of Turck safety barriers, while the fourth and final batch consisted of furniture, KVM switches, monitors and other smaller equipment provided by a German Company Hetec.</p>
<p><strong>Technology used:</strong> PCS7 DCS software, 10 Siemens Simatic PCS 7 410 redundant CPUs, more than 140 high availability Siemens IO modules ET 200SP HA, Siemens Industrial PCs, Siemens RACK units, Siemens SCALANCE switches, Turck safety barriers, KVM switch.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> SOC Gas plant control system upgrade – Engineering part<br />
<strong>Client:</strong> SOC<br />
<strong>Site:</strong> Brega<br />
<strong>Date:</strong>  2021-2022</p>
<p><strong>Description: </strong>Alshoala has contracted the replacement of the whole control system in the SOC Gas plant in Brega. The project has been contracted as an EPC project. The first part – Engineering has been successfully finished in the first half of 2021. Alshoala has designed a new control system consisting of equipment within the Control and operation room (DCS redundant servers, DCS clients, engineering and historian stations, KVM and communication equipment), and field equipment (Siemens redundant PLCs and needed number of IO modules). The customer was provided with contracted documentation and FAT for software was organized abroad.</p>
<p><strong>Importance of the site: </strong>Brega Gas plant was one of the first SOC installations, and has been working since the 60s. The previous control system was based on Yokogawa technology from 35 years ago and a new modern system was necessary to allow future operation of the plant.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Upgrade of air compressors’ control system at Wafa Field<br />
<strong>Client:</strong> Mellitah Oil&amp;Gas<br />
<strong>Site:</strong> Wafa Field<br />
<strong>Date:</strong>  September 2021</p>
<p><strong>Description:</strong> Replacement of the control system for the six air compressors at Wafa oil field. Air compressors are critical installation for the operation of the Wafa Field as compressed air is powering a good deal of process equipment. It is extremely important to keep air compressors running during all times as their stop could lead to the complete site shutdown. There are four main air compressors at the site as well as 2 start-up compressors. Our task was to replace control systems for all six compressors, as well as to replace the main synchronization controller. The project consisted of engineering, installation and commissioning of the equipment. Minor changes in the logic of the system synchronization were applied as a change of request, initiated by the client.</p>
<p><strong>Technology used: </strong>  Siemens Simatic S7-1200 PLCs.</p>
<p><strong>Importance of installation: </strong>Air compressors are powering up this site. At any given time at least two out of four main compressors must be working. Alshoala finished the works before the deadline and without site shutdown.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Replacement of Firefighting control system for SS4 in MOG<br />
<strong>Client:</strong> Mellitah Oil&amp;Gas<br />
<strong>Site:</strong> Sabratha<br />
<strong>Date:</strong> October 2020</p>
<p><strong>Description:</strong> Replacement of the existing HIMA control system. This interesting system is based on automation panel rather than a classical fire panel. So replacement is also based on automation system. Scope of this project was engineering, procurement, installation and commissioning of the new Siemens based control system.</p>
<p><strong>Technology used: </strong>Siemens Simatic S7 1500 PLC and ET 200SP IO modules, safety barriers.</p>
<p><strong>Challenges: </strong>Integration of the existing periphery to the new control system</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Upgrade of the inverter system in SOC<br />
<strong>Client:</strong> Sirte Oil Company<br />
<strong>Site:</strong> Brega<br />
<strong>Date:</strong> October 2020</p>
<p><strong>Description:</strong> Engineering, procurement, installation and commissioning of inverter system for the Sirte Oil Company. System is based on Benning equipment and consists of modular inverter 13,5kVA, two modular rectifiers 110V/100A, two modular rectifiers 24V/210A, batteries and two distributions. System was prepared by Benning Serbia, transported to Libya and successfully installed and commissioned by our engineers.</p>
<p><strong>Technology used: </strong>Benning INVERTRONIC compact Modular, Single Phase Inverters.</p>
<p><strong>Challenges: </strong>Installation of this system was crucial for the plant startup. Last-minute adaptations to the system were needed.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong><strong>Project Title:</strong> </strong>Siemens Simatic Training for SOC<strong><br />
<strong>Client:</strong> </strong>Sirte Oil Company<strong><br />
<strong>Date:</strong> </strong>August 2019</p>
<p><strong><strong>Description:</strong> </strong>Alshoala Engineering Company has organized and conducted three series of trainings for SOC engineers. These courses have targeted wide spectrum of engineers in both operation and maintenance departments, especially those who have the motivation to engage in PLC technology and develop new skills. Training started with basics of the automation field and progressed up to programming of complex tasks using Siemens Simatic S7-1200 units. Especially important aspect of the course was hands-on training on live PLC controllers and specially designed models. Using simple applications trainees were able to understand and learn how to program Siemens controllers themselves.<strong><br />
</strong></p>
<p><strong>  <a href="https://www.facebook.com/sirteoilcompany/videos/1052931124901446/"><img class="wp-image-1464 aligncenter" src="http://www.alshoala.net/wp-content/uploads/2019/09/Hassan.jpg" alt="Hassan" width="307" height="172" /></a></strong></p>
<p style="text-align: center;"><strong> SOC PR department video</strong></p>
<p>We strongly believe that the right path of progress is investing in knowledge of employees. For this reason we are pleased to have trained SOC engineers. With a new knowledge they will be able to better understand existing systems they have and to foresee future needs of their organization.</p>
<p><!--StartFragment--><div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div><!--EndFragment--></p>
<p><strong><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></strong></p>
<p><!--EndFragment--><strong>Project Title:</strong> Remote operated valve for Ubari power plant &#8211; phase I<br />
<strong>Client:</strong> GECOL<br />
<strong>Site:</strong> Al-Sharara oil field<br />
<strong>Date:</strong> April 2019</p>
<p>&nbsp;</p>
<p><strong>Description:</strong> Installation and commissioning of remotely operated pneumatic valve at Al Sharara oil field. Installation of local control panel from where valve can be operated manually as well as installation of temporary PLC cabinet at the operation room from where valve is operated automatically. Installation of the temporary SCADA system that allow users to operate valve from the PC.</p>
<p><strong>Technology used: </strong>Siemens S7-1200, HMI TP900 Comfort panels, WinCC SCADA, pneumatic control valve, pneumatic control system with piping.</p>
<p><strong>Importance of the project: </strong>Installation of this valve allows sending required amount of crude oil to Ubari power plant, which is supplying large part of southern Libya with power.</p>
<p>&nbsp;</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Upgrade of the control system for FMWR Sabratha platform<br />
<strong>Client:</strong> Mellitah Oil&amp;Gas B.V., Libyan Branch<br />
<strong>Site:</strong> FMWR Sabratha platform<br />
<strong>Date:</strong> August 2018</p>
<p><strong>Description:</strong> Engineering, procurement, installation and commissioning of control system for drilling process at Sabratha FMWR platform. System is based on Siemens Simatic S7-1500 PLC for monitoring and controlling 4 main motors (2 Mud Pumps, Top Drive and Draw Works), its blowers and washers, and 4 DC drives.</p>
<p><strong>Technology used: </strong>Siemens S7-1500, 2 HMI TP900 Comfort panels, 30 different I/O cards.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><!--EndFragment--></p>
<p><strong>Project Title:</strong> Replacement of control system for 4 Woma pumps<br />
<strong>Client:</strong> RASCO<br />
<strong>Site:</strong> Ras Lanuf<br />
<strong>Date:</strong> May 2018</p>
<p><!--EndFragment--></p>
<p><strong>Description:</strong> Design, engineering, procurement, installation and commissioning of 4 identical control systems for control of Woma pumps at Ras Lanuf refinery. In this way all pumps are unified in operation and in wiring. Main challenge was state of pumps themselves, existing wiring and mechanical issues.</p>
<p><strong>Technology used: </strong>Siemens S7-1200, HMI panels</p>
<p>&nbsp;</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Upgrade of Fire control panel in Zawia<br />
<strong>Client:</strong> Akakus Oil Operations<br />
<strong>Site:</strong> Zawia export terminal<br />
<strong>Date:</strong> August 2017</p>
<p><strong>Description:</strong> Removal of old existing fire detection panel, installation of new Siemens Sinteso FC2060 fire detection system, as well as one Siemens XC10 extinguishing panel. Marshaling of two new panels. Replacing part of the collective detectors. Programming new systems to work with the same logic as previous system. Connecting new installed systems to the existing SCADA. <a href="http://www.alshoala.net/wp-content/uploads/2017/11/Completion-Certficate.pdf">Completion certificate</a>.</p>
<p><strong>Technology used:</strong> Siemens Sinteso FS2060, Siemens XC10 extinguishing panel</p>
<p><strong>Challenge: </strong>Connection of existing detectors, EX proof equipment, Flame detectors, Linear Heat Cables.</p>
<p><strong> </strong></p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Upgrades in Tobruk main oil terminal &#8211; Phase C<br />
<strong>Client:</strong> Brega Petroleum Marketing Company<br />
<strong>Site:</strong> Tobruk oil terminal<br />
<strong>Date:</strong> May 2017</p>
<p><strong>Description:</strong> Removal of two old panels and obsolete wiring, installation and testing of 4 pressure indicator transmitters and two flow meters with needed wiring on two pipelines. Reprogramming of PLC, HMI and WinCC SCADA taking new instruments in considerations, all according to client&#8217;s requirements. Additional new 12&#8221; screen with site alarms display was installed and connected to the SCADA.</p>
<p><strong>Technology used:</strong> PLC S7-1500, HMI KTP1200 basic, WinCC SCADA</p>
<p><strong>Challenge: </strong>The Client demanded all work to be done without shutting down the whole facility.</p>
<p><strong>Importance of the site: </strong>This terminal is supplying the whole eastern part of Libya with oil, as well as cargo and oil tankers on its port.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div><!--StartFragment--></p>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Upgrades in Tobruk main oil terminal &#8211; Phase B<br />
<strong>Client:</strong> Brega Petroleum Marketing Company<br />
<strong>Site:</strong> Tobruk oil terminal<br />
<strong>Date:</strong> March 2017</p>
<p><strong>Description:</strong> Upgrading heavy oil tank farm and loading arms control from old relays system to fully automated up-to-date PLC control system. Old panels were replaced with new ones, new wiring was run, PLC, HMI and WINCC SCADA were programmed and installed according to client’s requirements.</p>
<p><strong>Challenge: </strong>The Client demanded all works to be done without shutting down facility, so it was performed in stages, migrating one tank with its utilities at a time.</p>
<p><strong>Importance of the site: </strong>This terminal is supplying the whole eastern part of Libya with oil, as well as cargo and oil tankers on its port.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><!--EndFragment--> <img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Upgrades in Sarir oil terminal &#8211; Phase A<br />
<strong>Client:</strong> Brega Petroleum Marketing Company<br />
<strong>Site:</strong> As-Sarir<br />
<strong>Date:</strong> January 2017</p>
<p><strong>Description:</strong> Upgrading loading arms control from old semi-automated Mitsubishi system to fully automated up-to-date PLC control system. Old panels were replaced with new ones, new wiring was run, PLC, HMI and WINCC SCADA were programmed and installed according to client’s requirements.</p>
<p><strong>Challenge: </strong>The Client demanded all work to be done without shutting down the whole facility, so it was performed in 8 stages migrating one loading arm, with its utilities, at a time.</p>
<p><strong>Importance of the site: </strong>This terminal is supplying the eastern part of Libya with oil, as well as Sarir power plant.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><!--EndFragment--></p>
<p><strong>Project Title:</strong> Upgrades in Tobruk main oil terminal &#8211; Phase A<br />
<strong>Client:</strong> Brega Petroleum Marketing Company<br />
<strong>Site:</strong> Tobruk oil terminal<br />
<strong>Date:</strong> October 2016</p>
<p><strong>Description:</strong> Upgrading 6.6 kV booster pumps control from old relays system to fully automated, up-to-date PLC control system. Old panels were replaced with new ones, new wiring was run, PLC, HMI, WINCC SCADA were programmed and installed according to client&#8217;s requirements. Additional pressure indicators, flow meters and temperature gauges were installed.</p>
<p><strong>Challenge: </strong>The Client demanded all works to be done without shutting down the facility, so it was performed in 4 stages, migrating one pump with its utilities, at a time.</p>
<p><strong>Importance of the site: </strong>This terminal is supplying the whole eastern part of Libya with oil, as well as cargo and oil tankers on its port.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Gas Plant Emergency Shutdown System<br />
<strong>Client:</strong> Sirte Oil Company<br />
<strong>Site:</strong> Sahl Field<br />
<strong>Date:</strong>  2014</p>
<p><strong>Description:</strong> Project includes the complete replacement of the old inoperative August Bonar System (now ABB) with Siemens PCS7, S7400HF system. Scope of works included the study, re-design, supply, installation and commissioning of new fail safe system, complete with training for client engineers. Project also included the replacement of all Zener barriers, interfacing EX rated instrumentation to the control system, alarm archiving server and operator stations.</p>
<p><strong>Importance of the site:</strong> <a href="http://www.alshoala.net/wp-content/uploads/2019/10/sahl-field6926668184814668244.pdf">Sahl-field news</a></p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Gas Compressor Control System<br />
<strong>Client:</strong> Mabrouk Oil Operations<br />
<strong>Site:</strong> Mabrouk Oil Field, Sirte</p>
<p><strong>Description:</strong> Program modification, testing, commissioning and startup of Gas Compressor control system. Main Controller Siemens Step 7 400H, interfaced to ABB DCS System through Modbus.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> IT Data Centre<br />
<strong>Client:</strong> Akakus Oil Operations<br />
<strong>Site:</strong> Tripoli HQ</p>
<p><strong>Description:</strong> Design, Supply, Installation, Testing and Commissioning of a complete Data Centre housing all the company’s IT Equipment. Scope of Works included the supply and installation of air conditioning system, Fire Alarm, FM200 Suppression System, Very Early Smoke Aspirating System (VESDA), Access Control, CCTV, Power &amp; Lighting, Raised Flooring, False Ceiling and a network management system to monitor all the systems through the corporate network.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title: </strong>PABX Room<br />
<strong>Client:</strong> Akakus Oil Operations<br />
<strong>Site:</strong> Tripoli HQ</p>
<p><strong>Description: </strong>Design, Supply, Installation, Testing and commissioning of a PABX Room housing the company&#8217;s central telephony equipment. Scope of Works included the supply and installation of a Fire Alarm System, FM200 Suppression System, Very Early Smoke Aspirating System (VESDA), Access Control and a network management system to monitor all the systems through the corporate network.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title:</strong> Fuel Forwarding Terminal Control and SCADA System<br />
<strong>Client:</strong> Brega Petroleum and Marketing Company<br />
<strong>Site:</strong> Tripoli Airport Fueling Station</p>
<p><strong>Description:</strong> Complete design, installation, programming, testing and commissioning of a control and SCADA system for the Tripoli Airport fueling terminal. Hardware included S7-300 Main Controller, PDSIII Pressure Transmitter, Radar Level Transmitters, Rotork Actuator Valves, Oil System Filter, Soft Starters w/Profibus card for main pump and 3x Clamp-on Ultrasonic Flowmeters. WinCC SCADA system for control and monitoring. OP177P for local operation.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<p><img src="http://www.alshoala.net/wp-content/uploads/2014/04/border-references.jpg" alt="border-references" width="912" height="1" /></p>
<p><strong>Project Title: </strong>Loading Arm Gantry Control and SCADA System<br />
<strong>Client:</strong> Brega Petroleum and Marketing Company<br />
<strong>Site: </strong>Benghazi</p>
<p><strong>Description: </strong>Complete design, installation, programming, testing and commissioning of a control and SCADA system, to monitor the truck loading operations. Hardware used included a Step 7 300 Main Controller, HMI Basic Color Panel KTP1500, 1x PD Meter and pressure transmitter.</p>
<div class="su-spoiler su-spoiler-style-default su-spoiler-icon-chevron su-spoiler-closed"><div class="su-spoiler-title"><span class="su-spoiler-icon"></span>Image gallery</div><div class="su-spoiler-content su-clearfix"></div></div>
<div class="WordSection1"></div>
<p><span lang="EN-GB" style="font-size: 11.0pt; line-height: 107%; font-family: 'Calibri',sans-serif; mso-ascii-theme-font: minor-latin; mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-hansi-theme-font: minor-latin; mso-bidi-font-family: Arial; mso-bidi-theme-font: minor-bidi; mso-ansi-language: EN-GB; mso-fareast-language: EN-US; mso-bidi-language: AR-SA;"><br style="page-break-before: always; mso-break-type: section-break;" clear="all" /> </span></p>
<p><!-- [if gte mso 9]><xml>
<o:OfficeDocumentSettings>
<o:AllowPNG/>
</o:OfficeDocumentSettings>
</xml><![endif]--><!-- [if gte mso 9]><xml>
<w:WordDocument>
<w:View>Normal</w:View>
<w:Zoom>0</w:Zoom>
<w:TrackMoves/>
<w:TrackFormatting/>
<w:PunctuationKerning/>
<w:ValidateAgainstSchemas/>
<w:SaveIfXMLInvalid>false</w:SaveIfXMLInvalid>
<w:IgnoreMixedContent>false</w:IgnoreMixedContent>
<w:AlwaysShowPlaceholderText>false</w:AlwaysShowPlaceholderText>
<w:DoNotPromoteQF/>
<w:LidThemeOther>EN-GB</w:LidThemeOther>
<w:LidThemeAsian>X-NONE</w:LidThemeAsian>
<w:LidThemeComplexScript>AR-SA</w:LidThemeComplexScript>
<w:Compatibility>
<w:BreakWrappedTables/>
<w:SnapToGridInCell/>
<w:WrapTextWithPunct/>
<w:UseAsianBreakRules/>
<w:DontGrowAutofit/>
<w:SplitPgBreakAndParaMark/>
<w:EnableOpenTypeKerning/>
<w:DontFlipMirrorIndents/>
<w:OverrideTableStyleHps/>
</w:Compatibility>
<m:mathPr>
<m:mathFont m:val="Cambria Math"/>
<m:brkBin m:val="before"/>
<m:brkBinSub m:val="&#45;-"/>
<m:smallFrac m:val="off"/>
<m:dispDef/>
<m:lMargin m:val="0"/>
<m:rMargin m:val="0"/>
<m:defJc m:val="centerGroup"/>
<m:wrapIndent m:val="1440"/>
<m:intLim m:val="subSup"/>
<m:naryLim m:val="undOvr"/>
</m:mathPr></w:WordDocument>
</xml><![endif]--><!-- [if gte mso 9]><xml>
<w:LatentStyles DefLockedState="false" DefUnhideWhenUsed="false"   DefSemiHidden="false" DefQFormat="false" DefPriority="99"   LatentStyleCount="371">
<w:LsdException Locked="false" Priority="0" QFormat="true" Name="Normal"/>
<w:LsdException Locked="false" Priority="9" QFormat="true" Name="heading 1"/>
<w:LsdException Locked="false" Priority="9" SemiHidden="true"    UnhideWhenUsed="true" QFormat="true" Name="heading 2"/>
<w:LsdException Locked="false" Priority="9" SemiHidden="true"    UnhideWhenUsed="true" QFormat="true" Name="heading 3"/>
<w:LsdException Locked="false" Priority="9" SemiHidden="true"    UnhideWhenUsed="true" QFormat="true" Name="heading 4"/>
<w:LsdException Locked="false" Priority="9" SemiHidden="true"    UnhideWhenUsed="true" QFormat="true" Name="heading 5"/>
<w:LsdException Locked="false" Priority="9" SemiHidden="true"    UnhideWhenUsed="true" QFormat="true" Name="heading 6"/>
<w:LsdException Locked="false" Priority="9" SemiHidden="true"    UnhideWhenUsed="true" QFormat="true" Name="heading 7"/>
<w:LsdException Locked="false" Priority="9" SemiHidden="true"    UnhideWhenUsed="true" QFormat="true" Name="heading 8"/>
<w:LsdException Locked="false" Priority="9" SemiHidden="true"    UnhideWhenUsed="true" QFormat="true" Name="heading 9"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="index 1"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="index 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="index 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="index 4"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="index 5"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="index 6"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="index 7"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="index 8"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="index 9"/>
<w:LsdException Locked="false" Priority="39" SemiHidden="true"    UnhideWhenUsed="true" Name="toc 1"/>
<w:LsdException Locked="false" Priority="39" SemiHidden="true"    UnhideWhenUsed="true" Name="toc 2"/>
<w:LsdException Locked="false" Priority="39" SemiHidden="true"    UnhideWhenUsed="true" Name="toc 3"/>
<w:LsdException Locked="false" Priority="39" SemiHidden="true"    UnhideWhenUsed="true" Name="toc 4"/>
<w:LsdException Locked="false" Priority="39" SemiHidden="true"    UnhideWhenUsed="true" Name="toc 5"/>
<w:LsdException Locked="false" Priority="39" SemiHidden="true"    UnhideWhenUsed="true" Name="toc 6"/>
<w:LsdException Locked="false" Priority="39" SemiHidden="true"    UnhideWhenUsed="true" Name="toc 7"/>
<w:LsdException Locked="false" Priority="39" SemiHidden="true"    UnhideWhenUsed="true" Name="toc 8"/>
<w:LsdException Locked="false" Priority="39" SemiHidden="true"    UnhideWhenUsed="true" Name="toc 9"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Normal Indent"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="footnote text"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="annotation text"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="header"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="footer"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="index heading"/>
<w:LsdException Locked="false" Priority="35" SemiHidden="true"    UnhideWhenUsed="true" QFormat="true" Name="caption"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="table of figures"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="envelope address"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="envelope return"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="footnote reference"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="annotation reference"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="line number"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="page number"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="endnote reference"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="endnote text"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="table of authorities"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="macro"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="toa heading"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Bullet"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Number"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List 4"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List 5"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Bullet 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Bullet 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Bullet 4"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Bullet 5"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Number 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Number 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Number 4"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Number 5"/>
<w:LsdException Locked="false" Priority="10" QFormat="true" Name="Title"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Closing"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Signature"/>
<w:LsdException Locked="false" Priority="1" SemiHidden="true"    UnhideWhenUsed="true" Name="Default Paragraph Font"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Body Text"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Body Text Indent"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Continue"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Continue 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Continue 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Continue 4"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="List Continue 5"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Message Header"/>
<w:LsdException Locked="false" Priority="11" QFormat="true" Name="Subtitle"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Salutation"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Date"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Body Text First Indent"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Body Text First Indent 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Note Heading"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Body Text 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Body Text 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Body Text Indent 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Body Text Indent 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Block Text"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Hyperlink"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="FollowedHyperlink"/>
<w:LsdException Locked="false" Priority="22" QFormat="true" Name="Strong"/>
<w:LsdException Locked="false" Priority="20" QFormat="true" Name="Emphasis"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Document Map"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Plain Text"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="E-mail Signature"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="HTML Top of Form"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="HTML Bottom of Form"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Normal (Web)"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="HTML Acronym"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="HTML Address"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="HTML Cite"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="HTML Code"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="HTML Definition"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="HTML Keyboard"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="HTML Preformatted"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="HTML Sample"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="HTML Typewriter"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="HTML Variable"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Normal Table"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="annotation subject"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="No List"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Outline List 1"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Outline List 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Outline List 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Simple 1"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Simple 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Simple 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Classic 1"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Classic 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Classic 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Classic 4"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Colorful 1"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Colorful 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Colorful 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Columns 1"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Columns 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Columns 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Columns 4"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Columns 5"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Grid 1"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Grid 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Grid 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Grid 4"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Grid 5"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Grid 6"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Grid 7"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Grid 8"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table List 1"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table List 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table List 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table List 4"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table List 5"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table List 6"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table List 7"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table List 8"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table 3D effects 1"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table 3D effects 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table 3D effects 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Contemporary"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Elegant"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Professional"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Subtle 1"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Subtle 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Web 1"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Web 2"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Web 3"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Balloon Text"/>
<w:LsdException Locked="false" Priority="39" Name="Table Grid"/>
<w:LsdException Locked="false" SemiHidden="true" UnhideWhenUsed="true"    Name="Table Theme"/>
<w:LsdException Locked="false" SemiHidden="true" Name="Placeholder Text"/>
<w:LsdException Locked="false" Priority="1" QFormat="true" Name="No Spacing"/>
<w:LsdException Locked="false" Priority="60" Name="Light Shading"/>
<w:LsdException Locked="false" Priority="61" Name="Light List"/>
<w:LsdException Locked="false" Priority="62" Name="Light Grid"/>
<w:LsdException Locked="false" Priority="63" Name="Medium Shading 1"/>
<w:LsdException Locked="false" Priority="64" Name="Medium Shading 2"/>
<w:LsdException Locked="false" Priority="65" Name="Medium List 1"/>
<w:LsdException Locked="false" Priority="66" Name="Medium List 2"/>
<w:LsdException Locked="false" Priority="67" Name="Medium Grid 1"/>
<w:LsdException Locked="false" Priority="68" Name="Medium Grid 2"/>
<w:LsdException Locked="false" Priority="69" Name="Medium Grid 3"/>
<w:LsdException Locked="false" Priority="70" Name="Dark List"/>
<w:LsdException Locked="false" Priority="71" Name="Colorful Shading"/>
<w:LsdException Locked="false" Priority="72" Name="Colorful List"/>
<w:LsdException Locked="false" Priority="73" Name="Colorful Grid"/>
<w:LsdException Locked="false" Priority="60" Name="Light Shading Accent 1"/>
<w:LsdException Locked="false" Priority="61" Name="Light List Accent 1"/>
<w:LsdException Locked="false" Priority="62" Name="Light Grid Accent 1"/>
<w:LsdException Locked="false" Priority="63" Name="Medium Shading 1 Accent 1"/>
<w:LsdException Locked="false" Priority="64" Name="Medium Shading 2 Accent 1"/>
<w:LsdException Locked="false" Priority="65" Name="Medium List 1 Accent 1"/>
<w:LsdException Locked="false" SemiHidden="true" Name="Revision"/>
<w:LsdException Locked="false" Priority="34" QFormat="true"    Name="List Paragraph"/>
<w:LsdException Locked="false" Priority="29" QFormat="true" Name="Quote"/>
<w:LsdException Locked="false" Priority="30" QFormat="true"    Name="Intense Quote"/>
<w:LsdException Locked="false" Priority="66" Name="Medium List 2 Accent 1"/>
<w:LsdException Locked="false" Priority="67" Name="Medium Grid 1 Accent 1"/>
<w:LsdException Locked="false" Priority="68" Name="Medium Grid 2 Accent 1"/>
<w:LsdException Locked="false" Priority="69" Name="Medium Grid 3 Accent 1"/>
<w:LsdException Locked="false" Priority="70" Name="Dark List Accent 1"/>
<w:LsdException Locked="false" Priority="71" Name="Colorful Shading Accent 1"/>
<w:LsdException Locked="false" Priority="72" Name="Colorful List Accent 1"/>
<w:LsdException Locked="false" Priority="73" Name="Colorful Grid Accent 1"/>
<w:LsdException Locked="false" Priority="60" Name="Light Shading Accent 2"/>
<w:LsdException Locked="false" Priority="61" Name="Light List Accent 2"/>
<w:LsdException Locked="false" Priority="62" Name="Light Grid Accent 2"/>
<w:LsdException Locked="false" Priority="63" Name="Medium Shading 1 Accent 2"/>
<w:LsdException Locked="false" Priority="64" Name="Medium Shading 2 Accent 2"/>
<w:LsdException Locked="false" Priority="65" Name="Medium List 1 Accent 2"/>
<w:LsdException Locked="false" Priority="66" Name="Medium List 2 Accent 2"/>
<w:LsdException Locked="false" Priority="67" Name="Medium Grid 1 Accent 2"/>
<w:LsdException Locked="false" Priority="68" Name="Medium Grid 2 Accent 2"/>
<w:LsdException Locked="false" Priority="69" Name="Medium Grid 3 Accent 2"/>
<w:LsdException Locked="false" Priority="70" Name="Dark List Accent 2"/>
<w:LsdException Locked="false" Priority="71" Name="Colorful Shading Accent 2"/>
<w:LsdException Locked="false" Priority="72" Name="Colorful List Accent 2"/>
<w:LsdException Locked="false" Priority="73" Name="Colorful Grid Accent 2"/>
<w:LsdException Locked="false" Priority="60" Name="Light Shading Accent 3"/>
<w:LsdException Locked="false" Priority="61" Name="Light List Accent 3"/>
<w:LsdException Locked="false" Priority="62" Name="Light Grid Accent 3"/>
<w:LsdException Locked="false" Priority="63" Name="Medium Shading 1 Accent 3"/>
<w:LsdException Locked="false" Priority="64" Name="Medium Shading 2 Accent 3"/>
<w:LsdException Locked="false" Priority="65" Name="Medium List 1 Accent 3"/>
<w:LsdException Locked="false" Priority="66" Name="Medium List 2 Accent 3"/>
<w:LsdException Locked="false" Priority="67" Name="Medium Grid 1 Accent 3"/>
<w:LsdException Locked="false" Priority="68" Name="Medium Grid 2 Accent 3"/>
<w:LsdException Locked="false" Priority="69" Name="Medium Grid 3 Accent 3"/>
<w:LsdException Locked="false" Priority="70" Name="Dark List Accent 3"/>
<w:LsdException Locked="false" Priority="71" Name="Colorful Shading Accent 3"/>
<w:LsdException Locked="false" Priority="72" Name="Colorful List Accent 3"/>
<w:LsdException Locked="false" Priority="73" Name="Colorful Grid Accent 3"/>
<w:LsdException Locked="false" Priority="60" Name="Light Shading Accent 4"/>
<w:LsdException Locked="false" Priority="61" Name="Light List Accent 4"/>
<w:LsdException Locked="false" Priority="62" Name="Light Grid Accent 4"/>
<w:LsdException Locked="false" Priority="63" Name="Medium Shading 1 Accent 4"/>
<w:LsdException Locked="false" Priority="64" Name="Medium Shading 2 Accent 4"/>
<w:LsdException Locked="false" Priority="65" Name="Medium List 1 Accent 4"/>
<w:LsdException Locked="false" Priority="66" Name="Medium List 2 Accent 4"/>
<w:LsdException Locked="false" Priority="67" Name="Medium Grid 1 Accent 4"/>
<w:LsdException Locked="false" Priority="68" Name="Medium Grid 2 Accent 4"/>
<w:LsdException Locked="false" Priority="69" Name="Medium Grid 3 Accent 4"/>
<w:LsdException Locked="false" Priority="70" Name="Dark List Accent 4"/>
<w:LsdException Locked="false" Priority="71" Name="Colorful Shading Accent 4"/>
<w:LsdException Locked="false" Priority="72" Name="Colorful List Accent 4"/>
<w:LsdException Locked="false" Priority="73" Name="Colorful Grid Accent 4"/>
<w:LsdException Locked="false" Priority="60" Name="Light Shading Accent 5"/>
<w:LsdException Locked="false" Priority="61" Name="Light List Accent 5"/>
<w:LsdException Locked="false" Priority="62" Name="Light Grid Accent 5"/>
<w:LsdException Locked="false" Priority="63" Name="Medium Shading 1 Accent 5"/>
<w:LsdException Locked="false" Priority="64" Name="Medium Shading 2 Accent 5"/>
<w:LsdException Locked="false" Priority="65" Name="Medium List 1 Accent 5"/>
<w:LsdException Locked="false" Priority="66" Name="Medium List 2 Accent 5"/>
<w:LsdException Locked="false" Priority="67" Name="Medium Grid 1 Accent 5"/>
<w:LsdException Locked="false" Priority="68" Name="Medium Grid 2 Accent 5"/>
<w:LsdException Locked="false" Priority="69" Name="Medium Grid 3 Accent 5"/>
<w:LsdException Locked="false" Priority="70" Name="Dark List Accent 5"/>
<w:LsdException Locked="false" Priority="71" Name="Colorful Shading Accent 5"/>
<w:LsdException Locked="false" Priority="72" Name="Colorful List Accent 5"/>
<w:LsdException Locked="false" Priority="73" Name="Colorful Grid Accent 5"/>
<w:LsdException Locked="false" Priority="60" Name="Light Shading Accent 6"/>
<w:LsdException Locked="false" Priority="61" Name="Light List Accent 6"/>
<w:LsdException Locked="false" Priority="62" Name="Light Grid Accent 6"/>
<w:LsdException Locked="false" Priority="63" Name="Medium Shading 1 Accent 6"/>
<w:LsdException Locked="false" Priority="64" Name="Medium Shading 2 Accent 6"/>
<w:LsdException Locked="false" Priority="65" Name="Medium List 1 Accent 6"/>
<w:LsdException Locked="false" Priority="66" Name="Medium List 2 Accent 6"/>
<w:LsdException Locked="false" Priority="67" Name="Medium Grid 1 Accent 6"/>
<w:LsdException Locked="false" Priority="68" Name="Medium Grid 2 Accent 6"/>
<w:LsdException Locked="false" Priority="69" Name="Medium Grid 3 Accent 6"/>
<w:LsdException Locked="false" Priority="70" Name="Dark List Accent 6"/>
<w:LsdException Locked="false" Priority="71" Name="Colorful Shading Accent 6"/>
<w:LsdException Locked="false" Priority="72" Name="Colorful List Accent 6"/>
<w:LsdException Locked="false" Priority="73" Name="Colorful Grid Accent 6"/>
<w:LsdException Locked="false" Priority="19" QFormat="true"    Name="Subtle Emphasis"/>
<w:LsdException Locked="false" Priority="21" QFormat="true"    Name="Intense Emphasis"/>
<w:LsdException Locked="false" Priority="31" QFormat="true"    Name="Subtle Reference"/>
<w:LsdException Locked="false" Priority="32" QFormat="true"    Name="Intense Reference"/>
<w:LsdException Locked="false" Priority="33" QFormat="true" Name="Book Title"/>
<w:LsdException Locked="false" Priority="37" SemiHidden="true"    UnhideWhenUsed="true" Name="Bibliography"/>
<w:LsdException Locked="false" Priority="39" SemiHidden="true"    UnhideWhenUsed="true" QFormat="true" Name="TOC Heading"/>
<w:LsdException Locked="false" Priority="41" Name="Plain Table 1"/>
<w:LsdException Locked="false" Priority="42" Name="Plain Table 2"/>
<w:LsdException Locked="false" Priority="43" Name="Plain Table 3"/>
<w:LsdException Locked="false" Priority="44" Name="Plain Table 4"/>
<w:LsdException Locked="false" Priority="45" Name="Plain Table 5"/>
<w:LsdException Locked="false" Priority="40" Name="Grid Table Light"/>
<w:LsdException Locked="false" Priority="46" Name="Grid Table 1 Light"/>
<w:LsdException Locked="false" Priority="47" Name="Grid Table 2"/>
<w:LsdException Locked="false" Priority="48" Name="Grid Table 3"/>
<w:LsdException Locked="false" Priority="49" Name="Grid Table 4"/>
<w:LsdException Locked="false" Priority="50" Name="Grid Table 5 Dark"/>
<w:LsdException Locked="false" Priority="51" Name="Grid Table 6 Colorful"/>
<w:LsdException Locked="false" Priority="52" Name="Grid Table 7 Colorful"/>
<w:LsdException Locked="false" Priority="46"    Name="Grid Table 1 Light Accent 1"/>
<w:LsdException Locked="false" Priority="47" Name="Grid Table 2 Accent 1"/>
<w:LsdException Locked="false" Priority="48" Name="Grid Table 3 Accent 1"/>
<w:LsdException Locked="false" Priority="49" Name="Grid Table 4 Accent 1"/>
<w:LsdException Locked="false" Priority="50" Name="Grid Table 5 Dark Accent 1"/>
<w:LsdException Locked="false" Priority="51"    Name="Grid Table 6 Colorful Accent 1"/>
<w:LsdException Locked="false" Priority="52"    Name="Grid Table 7 Colorful Accent 1"/>
<w:LsdException Locked="false" Priority="46"    Name="Grid Table 1 Light Accent 2"/>
<w:LsdException Locked="false" Priority="47" Name="Grid Table 2 Accent 2"/>
<w:LsdException Locked="false" Priority="48" Name="Grid Table 3 Accent 2"/>
<w:LsdException Locked="false" Priority="49" Name="Grid Table 4 Accent 2"/>
<w:LsdException Locked="false" Priority="50" Name="Grid Table 5 Dark Accent 2"/>
<w:LsdException Locked="false" Priority="51"    Name="Grid Table 6 Colorful Accent 2"/>
<w:LsdException Locked="false" Priority="52"    Name="Grid Table 7 Colorful Accent 2"/>
<w:LsdException Locked="false" Priority="46"    Name="Grid Table 1 Light Accent 3"/>
<w:LsdException Locked="false" Priority="47" Name="Grid Table 2 Accent 3"/>
<w:LsdException Locked="false" Priority="48" Name="Grid Table 3 Accent 3"/>
<w:LsdException Locked="false" Priority="49" Name="Grid Table 4 Accent 3"/>
<w:LsdException Locked="false" Priority="50" Name="Grid Table 5 Dark Accent 3"/>
<w:LsdException Locked="false" Priority="51"    Name="Grid Table 6 Colorful Accent 3"/>
<w:LsdException Locked="false" Priority="52"    Name="Grid Table 7 Colorful Accent 3"/>
<w:LsdException Locked="false" Priority="46"    Name="Grid Table 1 Light Accent 4"/>
<w:LsdException Locked="false" Priority="47" Name="Grid Table 2 Accent 4"/>
<w:LsdException Locked="false" Priority="48" Name="Grid Table 3 Accent 4"/>
<w:LsdException Locked="false" Priority="49" Name="Grid Table 4 Accent 4"/>
<w:LsdException Locked="false" Priority="50" Name="Grid Table 5 Dark Accent 4"/>
<w:LsdException Locked="false" Priority="51"    Name="Grid Table 6 Colorful Accent 4"/>
<w:LsdException Locked="false" Priority="52"    Name="Grid Table 7 Colorful Accent 4"/>
<w:LsdException Locked="false" Priority="46"    Name="Grid Table 1 Light Accent 5"/>
<w:LsdException Locked="false" Priority="47" Name="Grid Table 2 Accent 5"/>
<w:LsdException Locked="false" Priority="48" Name="Grid Table 3 Accent 5"/>
<w:LsdException Locked="false" Priority="49" Name="Grid Table 4 Accent 5"/>
<w:LsdException Locked="false" Priority="50" Name="Grid Table 5 Dark Accent 5"/>
<w:LsdException Locked="false" Priority="51"    Name="Grid Table 6 Colorful Accent 5"/>
<w:LsdException Locked="false" Priority="52"    Name="Grid Table 7 Colorful Accent 5"/>
<w:LsdException Locked="false" Priority="46"    Name="Grid Table 1 Light Accent 6"/>
<w:LsdException Locked="false" Priority="47" Name="Grid Table 2 Accent 6"/>
<w:LsdException Locked="false" Priority="48" Name="Grid Table 3 Accent 6"/>
<w:LsdException Locked="false" Priority="49" Name="Grid Table 4 Accent 6"/>
<w:LsdException Locked="false" Priority="50" Name="Grid Table 5 Dark Accent 6"/>
<w:LsdException Locked="false" Priority="51"    Name="Grid Table 6 Colorful Accent 6"/>
<w:LsdException Locked="false" Priority="52"    Name="Grid Table 7 Colorful Accent 6"/>
<w:LsdException Locked="false" Priority="46" Name="List Table 1 Light"/>
<w:LsdException Locked="false" Priority="47" Name="List Table 2"/>
<w:LsdException Locked="false" Priority="48" Name="List Table 3"/>
<w:LsdException Locked="false" Priority="49" Name="List Table 4"/>
<w:LsdException Locked="false" Priority="50" Name="List Table 5 Dark"/>
<w:LsdException Locked="false" Priority="51" Name="List Table 6 Colorful"/>
<w:LsdException Locked="false" Priority="52" Name="List Table 7 Colorful"/>
<w:LsdException Locked="false" Priority="46"    Name="List Table 1 Light Accent 1"/>
<w:LsdException Locked="false" Priority="47" Name="List Table 2 Accent 1"/>
<w:LsdException Locked="false" Priority="48" Name="List Table 3 Accent 1"/>
<w:LsdException Locked="false" Priority="49" Name="List Table 4 Accent 1"/>
<w:LsdException Locked="false" Priority="50" Name="List Table 5 Dark Accent 1"/>
<w:LsdException Locked="false" Priority="51"    Name="List Table 6 Colorful Accent 1"/>
<w:LsdException Locked="false" Priority="52"    Name="List Table 7 Colorful Accent 1"/>
<w:LsdException Locked="false" Priority="46"    Name="List Table 1 Light Accent 2"/>
<w:LsdException Locked="false" Priority="47" Name="List Table 2 Accent 2"/>
<w:LsdException Locked="false" Priority="48" Name="List Table 3 Accent 2"/>
<w:LsdException Locked="false" Priority="49" Name="List Table 4 Accent 2"/>
<w:LsdException Locked="false" Priority="50" Name="List Table 5 Dark Accent 2"/>
<w:LsdException Locked="false" Priority="51"    Name="List Table 6 Colorful Accent 2"/>
<w:LsdException Locked="false" Priority="52"    Name="List Table 7 Colorful Accent 2"/>
<w:LsdException Locked="false" Priority="46"    Name="List Table 1 Light Accent 3"/>
<w:LsdException Locked="false" Priority="47" Name="List Table 2 Accent 3"/>
<w:LsdException Locked="false" Priority="48" Name="List Table 3 Accent 3"/>
<w:LsdException Locked="false" Priority="49" Name="List Table 4 Accent 3"/>
<w:LsdException Locked="false" Priority="50" Name="List Table 5 Dark Accent 3"/>
<w:LsdException Locked="false" Priority="51"    Name="List Table 6 Colorful Accent 3"/>
<w:LsdException Locked="false" Priority="52"    Name="List Table 7 Colorful Accent 3"/>
<w:LsdException Locked="false" Priority="46"    Name="List Table 1 Light Accent 4"/>
<w:LsdException Locked="false" Priority="47" Name="List Table 2 Accent 4"/>
<w:LsdException Locked="false" Priority="48" Name="List Table 3 Accent 4"/>
<w:LsdException Locked="false" Priority="49" Name="List Table 4 Accent 4"/>
<w:LsdException Locked="false" Priority="50" Name="List Table 5 Dark Accent 4"/>
<w:LsdException Locked="false" Priority="51"    Name="List Table 6 Colorful Accent 4"/>
<w:LsdException Locked="false" Priority="52"    Name="List Table 7 Colorful Accent 4"/>
<w:LsdException Locked="false" Priority="46"    Name="List Table 1 Light Accent 5"/>
<w:LsdException Locked="false" Priority="47" Name="List Table 2 Accent 5"/>
<w:LsdException Locked="false" Priority="48" Name="List Table 3 Accent 5"/>
<w:LsdException Locked="false" Priority="49" Name="List Table 4 Accent 5"/>
<w:LsdException Locked="false" Priority="50" Name="List Table 5 Dark Accent 5"/>
<w:LsdException Locked="false" Priority="51"    Name="List Table 6 Colorful Accent 5"/>
<w:LsdException Locked="false" Priority="52"    Name="List Table 7 Colorful Accent 5"/>
<w:LsdException Locked="false" Priority="46"    Name="List Table 1 Light Accent 6"/>
<w:LsdException Locked="false" Priority="47" Name="List Table 2 Accent 6"/>
<w:LsdException Locked="false" Priority="48" Name="List Table 3 Accent 6"/>
<w:LsdException Locked="false" Priority="49" Name="List Table 4 Accent 6"/>
<w:LsdException Locked="false" Priority="50" Name="List Table 5 Dark Accent 6"/>
<w:LsdException Locked="false" Priority="51"    Name="List Table 6 Colorful Accent 6"/>
<w:LsdException Locked="false" Priority="52"    Name="List Table 7 Colorful Accent 6"/>
</w:LatentStyles>
</xml><![endif]--><!-- [if gte mso 10]>


<style>
 /* Style Definitions */
table.MsoNormalTable
{mso-style-name:"Table Normal";
mso-tstyle-rowband-size:0;
mso-tstyle-colband-size:0;
mso-style-noshow:yes;
mso-style-priority:99;
mso-style-parent:"";
mso-padding-alt:0cm 5.4pt 0cm 5.4pt;
mso-para-margin-top:0cm;
mso-para-margin-right:0cm;
mso-para-margin-bottom:8.0pt;
mso-para-margin-left:0cm;
line-height:107%;
mso-pagination:widow-orphan;
font-size:11.0pt;
font-family:"Calibri",sans-serif;
mso-ascii-font-family:Calibri;
mso-ascii-theme-font:minor-latin;
mso-hansi-font-family:Calibri;
mso-hansi-theme-font:minor-latin;
mso-ansi-language:EN-GB;}
</style>



<![endif]--></p>
]]></content:encoded>
			<wfw:commentRss>https://www.alshoala.net/oil-gas/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>How to find us</title>
		<link>https://www.alshoala.net/how-to-find-us/</link>
		<comments>https://www.alshoala.net/how-to-find-us/#comments</comments>
		<pubDate>Fri, 11 Apr 2014 09:38:17 +0000</pubDate>
		<dc:creator><![CDATA[alshoala]]></dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.alto.rs/alshoala/?p=174</guid>
		<description><![CDATA[Head office in Tripoli &#160; Back office in Tripoli &#160; Competence center in Belgrade]]></description>
				<content:encoded><![CDATA[<h2>Head office in Tripoli</h2>
<script type='text/javascript' src='http://www.google.com/jsapi?ver=3.9.40'></script>

<style>
#map2
img {
max-width: none;
}
</style>
<div style="width:100%; height:350px;position:relative;">
<div id="map2" style="width:100%; height:350px;"></div></div>
<script type="text/javascript">
google.load("maps", "3.7", {"other_params" : "sensor=false&libraries=places,weather,panoramio,drawing&language="});
google.setOnLoadCallback(initialize);

var wgmp_circles 	= [];
var wgmp_polygons 	= [];
var wgmp_polylines 	= [];
var wgmp_rectangles = [];
var allmarkers 		= []; 

function initialize() {
infowindow =  new google.maps.InfoWindow();	
var latlng = new google.maps.LatLng(32.849782,13.072187);var mapOptions = {zoom: 16,
	scrollwheel: true,
	panControl: true,
	zoomControl: true,
	mapTypeControl: true,
	scaleControl: true,
	streetViewControl: true,
	overviewMapControl: true,
	center: latlng,
	mapTypeId: google.maps.MapTypeId.ROADMAP
	}
	map2 = new google.maps.Map(document.getElementById("map2"), mapOptions);
google.maps.event.addDomListener(window, 'resize', function() {
    google.maps.event.trigger(map2, 'resize');
    map2.setCenter(latlng);
});
marker0map2=new google.maps.Marker({
		map: map2,
		draggable:false,position: new google.maps.LatLng(32.849782, 13.072187), 
		title: "Head office in Tripoli",
		clickable: true,
		icon: "",
	  });google.maps.event.addListener(marker0map2, "click", function() {
	
	 
	 infowindow.setContent("Tripoli, Libya");	
	 infowindow.open(map2,marker0map2);
	 
	google.maps.event.addListener(map2, "click", function() {
		
		infowindow.close();
	
	});
	});	
	allmarkers.push(marker0map2);
	}</script>
<p>&nbsp;</p>
<h2>Back office in Tripoli</h2>

<style>
#map3
img {
max-width: none;
}
</style>
<div style="width:100%; height:350px;position:relative;">
<div id="map3" style="width:100%; height:350px;"></div></div>
<script type="text/javascript">
google.load("maps", "3.7", {"other_params" : "sensor=false&libraries=places,weather,panoramio,drawing&language="});
google.setOnLoadCallback(initialize);

var wgmp_circles 	= [];
var wgmp_polygons 	= [];
var wgmp_polylines 	= [];
var wgmp_rectangles = [];
var allmarkers 		= []; 

function initialize() {
infowindow =  new google.maps.InfoWindow();	
var latlng = new google.maps.LatLng(32.848856,13.078834);var mapOptions = {zoom: 16,
	scrollwheel: true,
	panControl: true,
	zoomControl: true,
	mapTypeControl: true,
	scaleControl: true,
	streetViewControl: true,
	overviewMapControl: true,
	center: latlng,
	mapTypeId: google.maps.MapTypeId.ROADMAP
	}
	map3 = new google.maps.Map(document.getElementById("map3"), mapOptions);
google.maps.event.addDomListener(window, 'resize', function() {
    google.maps.event.trigger(map3, 'resize');
    map3.setCenter(latlng);
});
marker0map3=new google.maps.Marker({
		map: map3,
		draggable:false,position: new google.maps.LatLng(32.848856, 13.078834), 
		title: "Back office in Tripoli",
		clickable: true,
		icon: "",
	  });google.maps.event.addListener(marker0map3, "click", function() {
	
	 
	 infowindow.setContent("Libya");	
	 infowindow.open(map3,marker0map3);
	 
	google.maps.event.addListener(map3, "click", function() {
		
		infowindow.close();
	
	});
	});	
	allmarkers.push(marker0map3);
	}</script>
<p>&nbsp;</p>
<h2>Competence center in Belgrade</h2>

<style>
#map4
img {
max-width: none;
}
</style>
<div style="width:100%; height:350px;position:relative;">
<div id="map4" style="width:100%; height:350px;"></div></div>
<script type="text/javascript">
google.load("maps", "3.7", {"other_params" : "sensor=false&libraries=places,weather,panoramio,drawing&language="});
google.setOnLoadCallback(initialize);

var wgmp_circles 	= [];
var wgmp_polygons 	= [];
var wgmp_polylines 	= [];
var wgmp_rectangles = [];
var allmarkers 		= []; 

function initialize() {
infowindow =  new google.maps.InfoWindow();	
var latlng = new google.maps.LatLng(44.802556,20.4706748);var mapOptions = {zoom: 16,
	scrollwheel: true,
	panControl: true,
	zoomControl: true,
	mapTypeControl: true,
	scaleControl: true,
	streetViewControl: true,
	overviewMapControl: true,
	center: latlng,
	mapTypeId: google.maps.MapTypeId.ROADMAP
	}
	map4 = new google.maps.Map(document.getElementById("map4"), mapOptions);
google.maps.event.addDomListener(window, 'resize', function() {
    google.maps.event.trigger(map4, 'resize');
    map4.setCenter(latlng);
});
marker0map4=new google.maps.Marker({
		map: map4,
		draggable:false,position: new google.maps.LatLng(44.802556, 20.4706748), 
		title: "Competence center in Belgrade",
		clickable: true,
		icon: "",
	  });google.maps.event.addListener(marker0map4, "click", function() {
	
	 
	 infowindow.setContent("46 Njegoseva, Belgrade, Serbia");	
	 infowindow.open(map4,marker0map4);
	 
	google.maps.event.addListener(map4, "click", function() {
		
		infowindow.close();
	
	});
	});	
	allmarkers.push(marker0map4);
	}</script>
]]></content:encoded>
			<wfw:commentRss>https://www.alshoala.net/how-to-find-us/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Contact us</title>
		<link>https://www.alshoala.net/contact-us/</link>
		<comments>https://www.alshoala.net/contact-us/#comments</comments>
		<pubDate>Fri, 11 Apr 2014 07:25:41 +0000</pubDate>
		<dc:creator><![CDATA[alshoala]]></dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.alto.rs/alshoala/?p=142</guid>
		<description><![CDATA[Head office in Tripoli Address: Tripoli &#8211; Libya P.O.BOX 91462 Telephone: +218 (0)21 484 13 89 Fax: +218 (0)21 484 00 73 Competence center in Belgrade Address: Belgrad – Serbia, Krunska 83a Telephone: +381 (0)11 243 30 96 General Manager, Support for Industrial Automation Abdusalam Ali Aboazoum +218 (0)91 210 89 43 +218 (0)91 321...]]></description>
				<content:encoded><![CDATA[<table id="contact1" border="1" width="892" cellspacing="0" cellpadding="0">
<tbody>
<tr>
<td>
<h2>Head office in Tripoli</h2>
<p><strong>Address:</strong><br />
Tripoli &#8211; Libya P.O.BOX 91462<br />
<strong>Telephone:</strong><br />
+218 (0)21 484 13 89<br />
<strong>Fax:</strong><br />
+218 (0)21 484 00 73</td>
<td>
<h2>Competence center in Belgrade</h2>
<p><strong>Address:</strong><br />
Belgrad – Serbia, Krunska 83a<br />
<strong>Telephone:</strong><br />
+381 (0)11 243 30 96</td>
<td><img class="alignnone  wp-image-517" style="margin-top: -20px; margin-right: -20px;" src="http://www.alshoala.net/wp-content/uploads/2014/04/contactus-people.jpg" alt="contactus-people" width="269" height="172" /></td>
</tr>
</tbody>
</table>
<table id="contact" border="0" width="100%" cellspacing="0" cellpadding="0">
<tbody>
<tr>
<td width="50%"><strong>General Manager, Support for Industrial Automation</strong></p>
<p>Abdusalam Ali Aboazoum</p>
<p>+218 (0)91 210 89 43<br />
+218 (0)91 321 75 34<br />
<a href="mailto:abdusalam@alshoala.net" target="_blank">abdusalam@alshoala.net</a></td>
<td width="50%"><strong>Support for Fire Safety</strong></p>
<p>Igor Grujić</p>
<p>+381 (0)60 817 03 73</p>
<p><a href="mailto:igor@alshoala.net" target="_blank">igor@alshoala.net</a></td>
</tr>
<tr>
<td><strong>Team Assistant</strong></p>
<p>Irena Dimić</p>
<p>+381 (0)64 566 19 94</p>
<p><a href="mailto:irena@alshoala.net">irena@alshoala.net</a></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>https://www.alshoala.net/contact-us/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Services</title>
		<link>https://www.alshoala.net/services/</link>
		<comments>https://www.alshoala.net/services/#comments</comments>
		<pubDate>Thu, 10 Apr 2014 08:41:31 +0000</pubDate>
		<dc:creator><![CDATA[alshoala]]></dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.alto.rs/alshoala/?p=125</guid>
		<description><![CDATA[Alshoala Company provides a complete package of high quality, value-added engineering and services in all aspects of Industrial Automation and Building Technology. We are supporting you with following services: Project design Designing entire project documentation-Tailor made solution based on customer requirements. Hardware selection Design of control panels, MCC and field wiring Design of schematic drawings...]]></description>
				<content:encoded><![CDATA[<p style="text-align: justify;">Alshoala Company provides a complete package of high quality, value-added engineering and services in all aspects of Industrial Automation and Building Technology. We are supporting you with following services:</p>
<h2 style="text-align: justify;"><img class="alignright size-full wp-image-533" src="http://www.alshoala.net/wp-content/uploads/2014/04/services-images1.jpg" alt="services-images" width="330" height="473" />Project design</h2>
<p>Designing entire project documentation-Tailor made solution based on customer requirements.</p>
<ul>
<li>Hardware selection</li>
<li>Design of control panels, MCC and field wiring</li>
<li>Design of schematic drawings</li>
<li>Project documentation</li>
<li>Maintenance manuals</li>
</ul>
<h2 style="text-align: justify;">Consulting</h2>
<p style="text-align: justify;">Depending on the stage of the project our experienced staff can support you with their expertise and knowhow. We can help you improve existing system or direct you how to specify a new one</p>
<ul>
<li>Upgrade</li>
<li>Migration</li>
<li>Revamping</li>
</ul>
<h2 style="text-align: justify;">Procurement &amp; Expediting</h2>
<p style="text-align: justify;">Alshoala Engineering Company is solution partner for Siemens equipment. Years of work and scores of project on Libyan market has taught us how do secure high quality equipment delivered on time according to pre-defined schedules.</p>
<h2 style="text-align: justify;">System Testing, Commissioning and Startup</h2>
<p style="text-align: justify;">Electrical testing, troubleshooting and commissioning of electric power systems is essential to the safe startup of any electrical system for the first time, regardless of its size, type or industry. It is a very special occurrence and poses some unique challenges to electrical personnel. Inexperience and poor planning will inevitably result in prolonged delays in the startup which can lead to costly productivity losses.</p>
<h2>Project management</h2>
<p>Project management is a growing field used increasingly by businesses of all sizes. As entrepreneurs and company executives deal with the daily responsibilities of managing an organization, it is important to use dedicated project managers to oversee projects from conception to completion. Understanding effective project management techniques helps organizations carry out large-scale projects on time, on budget and with minimal disruption to the rest of the business.</p>
<ul>
<li>Mitigate costs</li>
<li>Ensure on-time delivery</li>
<li>System of Communication</li>
<li>Prevent Scope Creep</li>
<li>Risk management</li>
</ul>
<h2><img class="wp-image-411 alignnone" src="http://www.alshoala.net/wp-content/uploads/2014/04/Ser-image-03.png" alt="Ser-image-03" width="800" height="337" /></h2>
<h2 style="text-align: justify;">Maintenance</h2>
<p style="text-align: justify;">Many suppliers claim that they can maintain your electrical systems just as well as the official Siemens partner can. However, proving this is difficult. Here we explain why Alshoala experts should service your systems regularly.</p>
<p style="text-align: justify;">As our customer, you have the certainty that we will be there for you with the same motivation and expertise across the entire life cycle of your system. We will accompany you through the decades, optimizing your system to be efficient and reliable, suggesting timely and modular modernization measures to protect your investment.</p>
<h2 style="text-align: justify;">Training</h2>
<p><em>“For the best return on your money, pour your purse into your head.”</em><br />
― <a href="http://www.goodreads.com/author/show/289513.Benjamin_Franklin">Benjamin Franklin</a></p>
<p>Alshoala Engineering Company can offer a number of courses both in Libya and abroad. We are mainly focusing on courses from the fields of Industrial Automation and Building Technologies, but we can provide courses in other areas as well. Do not hesitate to call us and check the availability of required course.</p>
]]></content:encoded>
			<wfw:commentRss>https://www.alshoala.net/services/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>About us</title>
		<link>https://www.alshoala.net/about-us/</link>
		<comments>https://www.alshoala.net/about-us/#comments</comments>
		<pubDate>Wed, 09 Apr 2014 08:54:51 +0000</pubDate>
		<dc:creator><![CDATA[alshoala]]></dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.alto.rs/alshoala/?p=115</guid>
		<description><![CDATA[Alshoala Engineering Company is a Siemens solution partner, providing a range of consulting, engineering, project management, maintenance services, training and implementation services to industrial clients in the Industrial Automation and Building Technology field. With many years in business, Alshoala individuals have gained extensive real-world experience of control system project in many industries, developing core competencies...]]></description>
				<content:encoded><![CDATA[<p style="text-align: justify;"><img class="alignright  wp-image-139" src="http://www.alshoala.net/wp-content/uploads/2014/04/employees-working.jpg" alt="employees-working" width="476" height="229" />Alshoala Engineering Company is a Siemens solution partner, providing a range of consulting, engineering, project management, maintenance services, training and implementation services to industrial clients in the Industrial Automation and Building Technology field.</p>
<p style="text-align: justify;">With many years in business, Alshoala individuals have gained extensive real-world experience of control system project in many industries, developing core competencies in the food and beverage, glass, chemical, metals, cement, water treatment, and paper and other industries.</p>
<p style="text-align: justify;">As your partner, Alshoala team of engineers are constantly exploring and evaluating proven technologies and adapting them to meet your needs. The company combines superior product and technology with industry-specific requirements. Its brands include SIEMENS</p>
<p style="text-align: justify;">Alshoala mission is to deliver highest quality of service resulting in measurable productive results for our customers.  We have developed the <a href="http://www.alshoala.net/wp-content/uploads/2024/08/POL-01-Quality-Policy-ver.-4-scan.pdf">Quality Policy</a> that governs day-to-day operations to ensure quality at all levels of the organization. We aim to develop and deliver cost-effective, integrated systems that improve client productivity, quality, competitiveness, and profitability.</p>
<p style="text-align: justify;">With long experience of its individuals, Alshoala is big enough to provide the depth of resources needed for responsive performance, yet small enough to give clients the personal attention and service they expect from it.</p>
<p style="text-align: justify;">A recent addition to our team is our Competence center stationed in Serbia, providing with a years of experiences in BT field.</p>
<p style="text-align: justify;">
]]></content:encoded>
			<wfw:commentRss>https://www.alshoala.net/about-us/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Low Voltage</title>
		<link>https://www.alshoala.net/low-voltage/</link>
		<comments>https://www.alshoala.net/low-voltage/#comments</comments>
		<pubDate>Mon, 07 Apr 2014 20:06:42 +0000</pubDate>
		<dc:creator><![CDATA[alshoala]]></dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.alto.rs/alshoala/?p=10</guid>
		<description><![CDATA[<ul><li>Distribution boards</li>
<li>Trunking systems</li>
<li>Terminal Blocks</li>
<li>Protection, switching</li>
<li>Software</li></ul>]]></description>
				<content:encoded><![CDATA[<h2>Integrated solutions for electrical power distribution</h2>
<p style="text-align: justify;">Our portfolio comprises switch boards, busbar trunking systems, distribution boards, measuring devices, circuit breakers and switch disconnectors, circuit protection, building management systems, switches and socket outlets. Around the world, the consistency, modularity and intelligence of our components and systems offer you numerous advantages – over the entire period of use. Developed according to the respective international standards, we offer trendsetting design and innovative functions in unique quality.</p>
<h2>Totally Integrated Power</h2>
<p><strong>Everything for power distribution</strong></p>
<p style="text-align: justify;">Consistent end-to-end solutions are needed for electric power distribution in buildings. Our answer is Totally Integrated PowerTM (TIP). TIP stands for innovative products, systems and software tools which ensure the safe and reliable distribution of electric power. They are supplemented by  communication- capable software modules which connect the power distribution system to the building automation system or industrial automation solutions.These in turn can be linked to a comprehensive energy management system which contributes to optimizing the consumption of electricity and hence to lowering operating costs.</p>
<p><img class="aligncenter size-full wp-image-60" alt="image-01" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-01.png" width="908" height="843" /></p>
<h2>Energy Management</h2>
<p>Knowing when and where how much energy is consumed – reduced costs through optimized energy use.</p>
<p><strong>Consistently well informed</strong></p>
<p style="text-align: justify;">A sustainable reduction of power costs first requires an analysis of the electrical system’s current consumption and power flows. All you need is provided by our power monitoring devices, E-counters and communication-capable circuit breakers. They precisely and reliably detect the power values for electric feeders or individual consumers. In addition, the power monitoring devices SENTRON PAC provide you with important measured values for assessing the system state and the power quality. For further processing of the measured data the devices come with manifold communication options for smoother integration in higher-level automation and energy management systems.</p>
<p><strong>Reliable through communication</strong></p>
<p style="text-align: justify;">Technical plants must run economically. This means continuously optimizing their capacity utilization and avoiding downtimes. Against this background the data from measuring devices and communication-capable switching and protection devices are being analyzed and documented to an increasing extent. From load profile curves and trend analyses to the visualization of switching states: Our measuring devices and software provide you with the information you need.</p>
<h2>SIVACON Switchboards and Busbar Trunking Systems</h2>
<p>A reliable low-voltage power distribution – the basis for safety and cost-effectiveness.</p>
<p><img class=" wp-image-63 alignleft" style="margin-right: 20px;" alt="image-02" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-02.png" width="392" height="330" /></p>
<p><strong>Safety in its most attractive form</strong></p>
<p style="text-align: justify;">Maximum safety and attractive design are offered by the innovative SIVACON® S8 generation of switchboards for the efficient distribution of power in industrial and nonresidential buildings. Diverse product features for improving personal and plant safety together with the attractive cabinet design open up many different fields of application.</p>
<p><strong>Optimum power flow</strong></p>
<p style="text-align: justify;">Busbar trunking systems SIVACON 8PS ensure the safe and cost-efficient flow of power in all kinds of applications. Altogether, six different systems offer everything for optimum power transportation and distribution: from simple planning, fast installation, safe operation to flexible modification and expandability.</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img class="aligncenter size-full wp-image-69" alt="image-03" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-03.png" width="824" height="443" /></p>
<h2>ALPHA Distribution Boards</h2>
<p>One range for all applications – uniform design, easy handling and high quality.</p>
<p><strong>The system idea counts</strong></p>
<p style="text-align: justify;">Whether you need small, wall-mounted or floor-mounted distribution boards – with our ALPHA distribution system you are sure of getting a well thought-out system which is fully compatible in technology and design. All ALPHA distribution boards offer highly reliable quality and safety meeting the regional standards. ALPHA SELECT configuration software makes planning easier and therefore reduces costs.</p>
<p><strong>Flexible for every need</strong></p>
<p style="text-align: justify;">ALPHA distribution boards offer you a comprehensiverange of wall-mounted and floor-mounted distribution boards for currents from 125 A to 1,250 A. ALPHA SIMBOX small distribution boards are used peripherally as sub-distribution boards. They are particularly notable for their uniform design and functionality.</p>
<p style="text-align: justify;"><strong>Functional in every environment</strong></p>
<p style="text-align: justify;">The ALPHA 8HP molded-plastic distribution system is a specially designed modular system which shows its strengths in harsh and aggressive environments. Therefore, it is particularly suitable for applications in industry and infrastructure.</p>
<p style="text-align: justify;"><strong>Always the right connection method</strong></p>
<p style="text-align: justify;">ALPHA FIX terminal blocks satisfy all expectations when it comes to easy and clearly arranged wiring. They are available for all standard connection methods.</p>
<p><img class=" wp-image-72 alignnone" alt="image-04" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-04.png" width="400" height="412" /><img class=" wp-image-73 alignnone" style="margin-left: 20px;" alt="image-05" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-05.png" width="400" height="412" /></p>
<h2>SENTRON Circuit Breakers and Switch Disconnectors</h2>
<p style="text-align: justify;">For many different applications from 16 A to 6,300 A – communication capability means there are no bounds to practical solutions for optimum power distribution.</p>
<p style="text-align: justify;"><strong>For boundless use</strong></p>
<p style="text-align: justify;">Whether it’s our air circuit breakers SENTRON® 3WL, molded-case circuit breakers SENTRON 3VL or the new innovative fuse switch disconnectors SENTRON 3NP1, well-proven switch disconnectors and in-line switch disconnectors with and without fuse – we have everything you need for cost-efficient, safe and reliable switching and protecting. With their consistent modular design and extensive range of accessories, SENTRON products meet today’s demands for versatility and flexibility.</p>
<p style="text-align: justify;"><strong>Full communication capability</strong></p>
<p style="text-align: justify;">Today, circuit breakers and switch disconnectors are more than just switching and protection devices. Using standardized bus systems, they can send important data for diagnostics, trouble-shooting, maintenance, power and cost center management to a central control room. Function block libraries enable easy integration in process control systems in order to monitor your power distribution and collect maintenance data. Intelligent switching devices thus make a major contribution to the realization of stringent communication solutions and open up new perspectives in the implementation of cost-efficient power distribution systems with a high level of availability.</p>
<p style="text-align: justify;"><img class="alignnone size-full wp-image-76" style="margin-right: 20px;" alt="image-06" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-06.png" width="400" height="410" /><img class="alignnone size-full wp-image-77" alt="image-07" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-07.png" width="400" height="411" /></p>
<h2>BETA Low-Voltage Circuit Protection</h2>
<p>Whether protecting, switching, measuring or monitoring – the comprehensive protection concept for all applications has the entire circuit under control.</p>
<p><strong>Always on the safe side</strong></p>
<p style="text-align: justify;">We offer a protection concept with a coordinated range of devices: for line, personell and fire protection, lightning and overvoltage protection, as well as device and plant protection. Switching, measuring and monitoring devices round out the lowvoltage circuit protection range. Our products comply with IEC/EN and UL standards, therefore they can be used world-wide.</p>
<p><strong>Safe and cost-efficient</strong></p>
<p style="text-align: justify;">With comprehensive circuit protection you improve plant availability, reduce maintenance work and considerably cut your operating costs. The result is a maximum of flexibility, convenience and safety for electrical installations in industrial applications, as well as infrastructure and buildings.</p>
<p><img class="alignnone size-full wp-image-80" style="margin-right: 20px;" alt="image-08" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-08.png" width="400" height="411" /><img class="alignnone size-full wp-image-81" alt="image-09" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-09.png" width="400" height="411" /></p>
<p><b>GAMMA Building Management Systems</b></p>
<p style="text-align: justify;">Expertise for every construction project – raising the level of safety and comfort while maximizing cost-efficiency.</p>
<p style="text-align: justify;"><strong>Diversity of applications in buildings</strong></p>
<p style="text-align: justify;">A building has to fulfill many different requirements. It must be architecturally attractive, functional, flexible in use and economical in operation. At the same time there are individual user peferences to be met with regard to lighting, sun protection and room climate, with solutions that are both comfortable and energy-saving. People and assets have to be protected against hazards and damage. Today, all these requirements can be met with the well-proven building management systems GAMMA instabus.</p>
<p style="text-align: justify;"><strong>Future-proof solutions custom-made</strong></p>
<p style="text-align: justify;">Whether you want to realize highly complex, multi-utility systems or are looking for small solutions – this technology can be adapted to your individual needs. With GAMMA instabus you will gain a great deal in terms of cost-efficiency, flexibility, comfort and market value. Choose GAMMA instabus today for a safe investment tomorrow. In our building management systems we integrate technologies such as Ethernet/IP, lighting with DALI, process automation and autonomous controllers. Furthermore, we lay the basis for optimum communication with a host of transmission options such as KNXnet/IP, twisted pair, infrared or wireless. As the market leader for these interfaces and transmission technologies we are always the right partner for your project.</p>
<p style="text-align: justify;"><strong>World-wide standard</strong></p>
<p style="text-align: justify;">With the trend-setting building management systems GAMMA instabus you are on the safe side. It is based on the worldwide standard KNX according to ISO/IEC 14543, which is used by more than 150 manufacturers in compatible products.</p>
<p><img class="alignnone size-full wp-image-83" style="margin-right: 20px;" alt="image-10" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-10.png" width="400" height="412" /><img class="alignnone size-full wp-image-84" alt="image-11" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-11.png" width="400" height="412" /></p>
<p><b>DELTA Switches and Socket Outlets</b></p>
<p style="text-align: justify;">Design to perfection – versatile switch ranges for every requirement.</p>
<p style="text-align: justify;"><strong>Diversity of design and function</strong></p>
<p style="text-align: justify;">Whether classical design or exclusivity, a flexible system or a high-grade material – our DELTA ranges are as varied as tastes themselves, and as international as our customers. You have a choice of  numerous switch ranges made of different materials and with countless combination options. The switches are functional and easy to install. Besides switches our offering includes also other user-friendly solutions for making your life safer, more agreeable and comfortable. For example: dimmers, motion detectors, smoke detectors, central blind/shutter controls, and remote control systems. Most ranges are suitable for GAMMA instabus – the building management systems for more safety and convenience in buildings.</p>
<p style="text-align: justify;"><strong>Environmentally friendly products</strong></p>
<p style="text-align: justify;">Another positive aspect of the DELTA ranges is the use of environmentally friendly materials. For example, the device inserts contain no cadmium or nickel, and the socket outlets and design elements no PVC or halogens. Our products are developed and manufactured in accordance with the most stringent environmental standards.</p>
<p style="text-align: justify;"><strong>International product portfolio</strong></p>
<p style="text-align: justify;">We offer a comprehensive range of products: switches and socket outlets in modular and monobloc technology for Asia and South America, for Europe in VDE technology and according to British standard.</p>
<p><img class="alignnone size-full wp-image-86" style="margin-right: 20px;" alt="image-12" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-12.png" width="400" height="409" /><img class="alignnone size-full wp-image-87" alt="image-13" src="http://www.alshoala.net/wp-content/uploads/2014/04/image-13.png" width="400" height="412" /></p>
]]></content:encoded>
			<wfw:commentRss>https://www.alshoala.net/low-voltage/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
